| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 LAccepted-Finance | 1 | Accepted-Finance Price Bid is evaluated | |
| 2 | 2₹3.8 L+₹7,035 (1.90%)Accepted-Finance | 2 | Accepted-Finance Price Bid is evaluated |
Tender Value
Refer Docs
EMD Value
₹4,600
Closing Date
20 Jul 2023, 2:00 pmClosed
SE M II / TTPS
Superintending Engineer, Mechanical-II, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II AHP Unit IV BAH Scrapper Conveyor Feeder 4A1 Erection of new side plates bottom plate and its supporting channels after removing of wornout side plates bottom plate channels and normalising the feeder
2023_EB_336095_1
SE/M-II /TTPS/ No.237/2023-24
Open Tender
Miscellaneous Works
Item Rate
15 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹4,600
Yes
24 Jul 2023
5 Jul 2023
21 Jul 2023
5 Jul 2023
20 Jul 2023
5 Jul 2023
Complete dismantling of submersible idler assembly with wheel from the slag bath of the SCF and re-fixing after completion of work including cost of consumables and hire charges for T&P's etc., complete.
Charges for seperating and arresting the existing SCF drive arrangement support assembly from feeders body for replacing the Gear coupling end side plate by cutting the channels and move the arrangement away from SCF body, grinding the cutting edges for re-fixing after completion of and re-welding with the side plates of SCF body. This includes cost of consumables like gouging electrode, grinding wheel etc., and hire charges for T&P's complete.
Charges for dismantling the scrapper conveyor feeder gear coupling end side plate and free end side plate support channels removing, grinding the weldments, releasing the bends for further usage and re-erecting the old/new SS channels with new side plates and with bottom channels and feeder bed channels. This includes cost of consumables like gouging electrodes. S.S.Electrodes. cutting gas.etc and hire charges for T&P's.
Charges for cutting and removing the wornout M.S/S.S feeder body gear coupling end side plates and free end side plate from bottom plate after taking the existing dimensions like gap between side plates, diagonal lengths, slag bath height etc., as per the direction of Engineer - in - charge including cot of consumables like gouging electrode, cutting gas and hire charges for T&P's like welding machine, cutting set etc., transportation of new plates from stores and devolution of scrap stores.
Charges for transporting of SCF side plates from central stores, lifting of new side plates, setting, aligning the plates, welding the plates with bottom & slope plates, and with bottom & slope plate channels, fixing the necked flange, making 4 nos openings for fixing submersible idler wheel assembly and 4 nos opening for fixing bottom idler wheel assembly fixing the support arrangement for plummer block, inspection of any water leakage in welding and re-welding including cost of consumables like gouging rod, S.S.Electrode etc., and hire charges for T&P's like welding machine grinding machine. chisels, etc., complete.
Charges for fixing of cover plate assembly and over flow arrangement in the free end side plate, setting, welding with side plate, arresting water leakage including cost of consumables like gouging electrodes etc., and hire charges for T&P's etc., complete.
Removing the 1 No chain tension adjustment assembly from old side plate and erection of the same chain tension adjustment assembly in new side plate by lifting the driven shaft assembly by jockey on both free end, arresting with proper supports. Removing and refixing the plummer block. And then assembling & aligning the driven shaft assembly after completion of 1 No chain tension adjustment assembly erection work. Including cost of consumables like cutting rod, SS welding rod, etc., T&P complete.
Arresting the side plates at 4 to 5 location both in slag bath and slope side to prevent misalignment cutting the wornout SS slag bath bottom and slope plate from its supports channels, removing, lowering, the same transport this scrap materials to stores including cost of gouging electrode, cutting gas, consumables and hire charges for T&P's etc., complete.
Cutting and releasing the wornout S.S channels of slag bath bottom, fixing new SS channels and welding the same with slope, bottom plates including cost of gouging electrodes, SS electrodes etc., transportation of materials from and to stores and hire charges for T&P's complete
Transporting the bottom plate from stores, lifting and placing over its support channels, sizing the plates to site requirements, zero setting, welding the edges with SS support channels by SS electrodes as per the direction of Engineer in charge including cost of consumables like SS welding electrode, gouging electrode and hire charges for T&P's etc.,
Commissioning of SCF assembly by setting, aligning of slag bath idler wheel, bottom idler wheel assembly with respect to drive and driven shaft, making necessary correction in the above said items, setting corrections with trail run, run the feeder for 24 hours without any chain slippage and set the feeder in complete shape, welding at necessary locations and put the feeder in service including cost of consumables and hire charges for T&P's
BIRUNTHA ENGINEERING CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .