3. RCC column work for the main gate under the municipality limits.
2026_DOLBU_1182777_3
2568/J.N.V./E-Ni.su./2026-27 date 02.09.2026
Open Tender
Construction Works
Percentage
120 days
Etawah
Please refer Tender documents
2 documents required · 2 mandatory
₹5,074
EO
₹4.0 L
7 Sept 2026
7 Sept 2026
26 Sept 2026
7 Sept 2026
26 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavationinordinarysoil(loam, clay or sand) including lift up to 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to thespace between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m fromthe foundation trenches.(S.I No. 251) | 203.2 | m3 | 145 | ₹29,464 |
| 1.02 | Providing and laying cement concrete in 1:4:8 (1 cement: 4 coarse sand: 8 Stone Ballast 40 mm gauge) and curing complete including cost of formworkinfoundation and floors. (S.I. No.. 281) | 23.2 | m3 | 6,000 | ₹1,39,200 |
| 1.03 | R.C.C work withcement approvedcourse sand and 2 cm gauge approved grite in the proportion of 1: 1.5: 3 in Coloums excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 BWGGI binding wire and including the cost of binding wire moulds all other material labour & T&P etc. required for preparation of the work binding wire cost being including in the item. (S.I. No-289). | 160.54 | m3 | 8,800 | ₹14,12,752 |
| 1.04 | Mild Steel of Iron in plain work such as reinforced concertofreinforcementwrought torequiredshape as necessary including benefited for proper completion for the work and including supply of all steel and wastage and over lapping and hooks.(S.I.No.504)INCOLUMN | 252.05 | Qtl | 7,050 | ₹17,76,952.5 |
| 1.05 | Add 18.00% G.S.T charge | 1 | m2 | 6,04,531.5 | ₹6,04,531.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_2224463.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .