Loading…
Loading…
Tender Value
₹42.8 L
EMD Value
₹85,660
Closing Date
15 Sept 2026, 6:00 pmDue today
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_323960_4
e-NIT No. 172 REW UDHAMPUR of 2026-27 Dated 08-09-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹85,660
9 Sept 2026
9 Sept 2026
16 Sept 2026
9 Sept 2026
15 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add provision forCIB & GPS Photographs/Wall painting and alphabet writing( to be paid as per actual) MARBLE MADE 3'X3'. | 1 | no | 8,000 | ₹8,000 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 135.94 | cum | 592.9 | ₹80,598.83 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All Kind of Soil | 61.04 | cum | 479.3 | ₹29,256.47 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size). | 20.18 | cum | 4,826.5 | ₹97,398.77 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 31.29 | cum | 5,733.6 | ₹1,79,404.34 |
| 6 | Dry random rubble masonry with hard stone in foundation and plinth:Without bond stone. | 50.98 | cum | 2,793.8 | ₹1,42,427.92 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level.:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) . | 15.75 | cum | 7,788.4 | ₹1,22,667.3 |
| 8 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 6.94 | cum | 9,395.7 | ₹65,206.16 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 1.5 coarse sand :3 graded stone aggregates 20mm nominal size. in 1:1.5:3 mix. | 5.82 | cum | 9,821.85 | ₹57,163.17 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete including all leads, lift and carriage complete.Including all lead and lift. | 2,138.17 | kg | 123.2 | ₹2,63,422.54 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_1091967.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .