Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.9 L
EMD Value
₹11,720
Closing Date
19 Oct 2026, 4:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Ex. Engineer CDC SMC Srinagar
Regal Lane Lal Chowk Srinagar
construction of deep drain from Dr. Nasrullah to Abu Bakar Masjid at Jawarnagar
2026_HAUDD_327763_1
e_NIT_NO_34_CDC_of_2026_27
Open Tender
Civil Works
Percentage
15 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
FA/ CAO SMC,
₹11,720
10 Oct 2026
10 Oct 2026
21 Oct 2026
11 Oct 2026
19 Oct 2026
11 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling and Sacrifying of road surface including stacking of serviceable material within 50Mtr lead Bituminous macadam Road | 85.5 | Sqm | 305.95 | ₹26,158.73 |
| 2.01 | Earth work in excavation by manual means trenches for foundations drains, pipes and cables (not exceeding 1.5m.in width) and for shafts, wells cesspits and the like not exceeding 10 Sqm on plan, including dressing of side and ramming of bottoms lift upto 1.5 m including getting out excavated earth and disposal of surplus excavated earth by directed All kinds of Soil | 36.03 | Cum | 479.3 | ₹17,268.6 |
| 2.02 | Earth work in excavation by mechanical means trenches for foundations drains, pipes and cables (not exceeding 1.5m.in width) and for shafts, wells cesspits and the like not exceeding 10 Sqm on plan, including dressing of side and ramming of bottoms lift upto 1.5 m including getting out excavated earth and disposal of surplus excavated earth by directed All kinds of Soil | 84.07 | Cum | 256.85 | ₹21,592.66 |
| 3 | Providing and laying of stone soling in trenches for drain including manholes. | 9.52 | Cum | 1,000 | ₹9,522 |
| 4 | Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:4:8 (1cement:4coarse sand: 8graded stone aggregate 40mm nominal size) Crushed | 1.94 | Cum | 5,202.9 | ₹10,114.44 |
| 5 | Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:3:6 (1cement: 3coarse sand: 6graded stone aggregate 40mm nominal size) Crushed | 12.4 | Cum | 5,733.6 | ₹71,096.64 |
| 6 | Providing & laying in position Cement concrete of specified grade excluding the cost of centring shuttering, finishing & reinforcement All work upto plinth level:-1:1.5:3(1cement:1.5 coarse sand:3graded stone aggregate 20mm nominal size). | 4.28 | Cum | 7,788.4 | ₹33,365.51 |
| 7 | Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:2:4 (1cement: 2coarse sand: 4graded stone aggregate 20mm nominal size) | 0.86 | Cum | 6,591.25 | ₹5,694.84 |
| 8 | Reinforcement for R.C.C. work including straightening cutting bending ,placing in position and binding all complete - | 321.3 | Kg | 123.2 | ₹39,584.16 |
| 9.01 | Centring & shuttering including strutting propping etc. & removal of form work for:-a)-vertical wall | 34.56 | Sqm | 286.35 | ₹9,896.26 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_1109185.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .