Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹15.8 L
Closing Date
21 Apr 2026, 12:00 pmClosed
SE BSRO PWD BULANDSHAHR
SE BSRO PWD BULANDSHAHR
Construction of a drain from Sabli Underpasses No. 1 and 2 to the Sabli Nala situated on NH-09 in Hapur District during the Financial Year 2025-26
2026_CEMRT_1137416_1
3286/96M /E-TENDER/BSRO/2025-26 Dated 21.03.2026
Open Tender
Civil Works
Percentage
180 days
HAUR
-
2 documents required · 2 mandatory
₹2,714
₹15.8 L
Yes
20 Jun 2026
16 Apr 2026
21 Apr 2026
16 Apr 2026
21 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structure as per drawing and technical specification, including setting out construction of shoring and bracing, removal of stumps and other deletrious matter, dressing of sides and bottom and backfilling with approved material.Rates are inclusive of all material, labour, T&P etc. labour cess, royalty and all taxes required of proper completion of work but excluding the cost of GST. | - | Cum | - | - |
| 2 | Plain Cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Rates are inclusive of all material, labour, T&P etc. labour cess, royalty and all taxes required of proper completion of work but excluding the cost of GST. | - | Cum | - | - |
| 3 | Plain/ Reinfoced Cement Concrete Grade M 20 in Open Foundation complete as per Drawing and Technical Specifications,Rates are inclusive of all material, labour, T&P etc. labour cess, royalty and all taxes required of proper completion of work but excluding the cost of GST. | - | Cum | - | - |
| 4 | Supplying, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.Rates are inclusive of all material, labour, T&P etc. labour cess, royalty and all taxes required of proper completion of work but excluding the cost of GST. | - | MT | - | - |
| 5 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work,steel work including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Rates are inclusive of all material, labour, T&P etc. labour cess, royalty and all taxes required of proper completion of work but excluding the cost of GST. | - | Cum | - | - |
| 6 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceable and unserviceable materials separately. Rates are inclusive of all material, labour, T&P etc. labour cess, royalty and all taxes required of proper completion of work but excluding the cost of GST. | - | Cum | - | - |
| 7 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceable and unserviceable materials separately.Rates are inclusive of all material, labour, T&P etc. labour cess, royalty and all taxes required of proper completion of work but excluding the cost of GST. | - | Cum | - | - |
| 8 | Sand filling in Foundation Trenches as per Drawing & Technical Specification Rates are inclusive of all material, labour, T&P etc. labour cess, royalty and all taxes required of proper completion of work but excluding the cost of GST. | - | Cum | - | - |
| 9 | Laying Reinforced Cement Concrete Pipe NP4/ Prestressed Concrete pipe for culverts on First Class Bedding of granular material in Single Row.including fixing collar with cement mortar 1:2 but excluding excavation protection works, backfilling, concrete and masonry works in head walls and parapets.Rates are inclusive of all material, labour, T&P etc. labour cess, royalty and all taxes required of proper completion of work but excluding the cost of GST. | - | RM | - | - |
| 10 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.Rates are inclusive of all material, labour, T&P etc. labour cess, royalty and all taxes required of proper completion of work but excluding the cost of GST. | - | Cum | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.21 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
Tendernotice_2.pdf
PDF • 1.82 MB
BOQ_2123995.xls
BOQ • 1.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .