Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical D NO 8 2 334 K 1 5TH FLOOR 503 AND 504 ADITYA COURT ROAD NO 05 BANJARA HILLS HYDERABAD 500034 TELANGANA HYDERABAD TELANGANA 500034 | HYDERABAD | TELANGANA | 500034 | Accepted-Technical Recommended |
| 2 | Accepted-Technical J 14A SECTOR 63 GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | Accepted-Technical Recommended |
| 3 | Accepted-Technical NO 3 2ND FLOOR OLD NO 18 23 3RD MAIN ROAD PEENYA INDUSTRIAL AREA PEENYA 1ST PHASE BANGALORE 560 058 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560058 | Accepted-Technical Recommended |
| 4 | Accepted-Technical | Accepted-Technical Recommended |
Tender Value
Refer Docs
EMD Value
₹6 L
Closing Date
30 Dec 2025, 12:00 pmClosed
Sanjeev Kumar
BHARAT HEAVY ELECTRICALS LIMITED, POWER SECTOR - PROJECT ENGINEERING MANAGEMENT, BHEL SADAN, PLOT NO.25, SECTOR-16A, NOIDA-201301,UP, INDIA
MILL REJECT SYSTEM (MECHANICAL CONVEYOR TYPE) for 2 X 800 MW NTPC SINGRAULI TPP Refer NIT for details
2025_BHEL_55492_1
77/25/6211/SAN
Open Tender
Machinery and Machining Tools
Supply
660 days
As per SCC of the project
Refer NIT for details
5 documents required · 5 mandatory
₹0
₹6 L
Yes
10 Feb 2026
3 Dec 2025
30 Dec 2025
3 Dec 2025
30 Dec 2025
3 Dec 2025
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tendernotice_4.pdf
PDF • 8.22 MB
Tendernotice_6.pdf
PDF • 3.02 MB
Tendernotice_8.pdf
PDF • 6.72 MB
Tendernotice_3.pdf
PDF • 0.43 MB
Tendernotice_5.pdf
PDF • 0.32 MB
Tendernotice_7.pdf
PDF • 0.93 MB
Tendernotice_9.pdf
PDF • 3.58 MB
Tendernotice_2.pdf
PDF • 18.17 MB
Tendernotice_1.pdf
PDF • 14.24 MB
NEWPF.xls
BOQ • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .