Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Bankura Division, PWD
Office of the Executive Engineer Bankura Division PWD Kenduadihi Bankura
Construction of separate Toilet Facilities in the Court premises of Sadar Bankura under Bankura Division PWD during the year 2025-26 (2ndCall)
2026_WBPWD_5015603_1
WBPWD/EE/BANKURA DIVISION/NIT- 04/2026-2027
Open Tender
CIVIL WORKS
120 days
Bankura
Please refer Tender documents.
4 documents required · 4 mandatory
₹96,583
16 Jun 2026
16 Jun 2026
8 Jul 2026
22 Jun 2026
6 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A : Main Building
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
In ground floor including roof.
(a) upto 150 mm. thick | 1 | Cu.m. | 939 | ₹938.06 |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming thesides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | 1 | Cu.m. | 119.27 | ₹119.15 |
| 3 | (B) Filling in foundation or plinth by Fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | - | Cu.m. | 592.57 | - |
| 4 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 1 | Sq.m. | 24 | ₹23.98 |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
Using Pakur Variety stone chips
In Ground Floor | - | Cu.m. | 4,835.18 | - |
| 6 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction ofEngineer-in charge. Consumption ofcement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.
[using concrete mixture]
M 25 Grade (i) Pakur Variety
In Ground Floo | 1 | Cu.m. | 5,816.2 | ₹5,810.38 |
| 6.01 | [using concrete mixture]
M 25 Grade (i) Pakur Variety
In First Floor | 1 | Cu.m. | 5,911.2 | ₹5,905.29 |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL
In Ground floor | - | MT | 55,134.03 | - |
| 7.01 | (i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL
In First floor | - | MT | 55,564.03 | - |
| 8 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
In Ground floor,
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work | 1 | Sq.m. | 357 | ₹356.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
2911-ii.pdf
Tender Documents • 0.58 MB
BOQ_5084485.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid