| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.0 LAccepted-Finance B B DIPLOMA ENGG CONTRACTOR S O AKSHYA KUMAR TRIPATHY AT WARD NO 19 BALANGIR MUNICIPALITY DIST BALANGIR PIN 767001 | BALANGIR | ODISHA | 767001 | ₹21.0 L | L1 | Accepted-Finance won in the transparent lottery |
| 2 | L1₹21.0 LRejected-Finance GUDVELA | ₹21.0 L | L1 | Rejected-Finance lose in the transparent lottery |
| 3 | L1₹21.0 LRejected-Finance | ₹21.0 L | L1 | Rejected-Finance lose in the transparent lottery |
| 4 | L1₹21.0 LRejected-Finance AGALPUR BLOCK IN THE DISTRICT OF BALANGIR | ₹21.0 L | L1 | Rejected-Finance lose in the transparent lottery |
| 5 | L1₹21.0 LRejected-Finance | ₹21.0 L | L1 | Rejected-Finance lose in the transparent lottery |
Tender Value
₹21.1 L
EMD Value
₹21,055
Closing Date
12 Jun 2026, 5:30 pmClosed
Superintending Engineer
Office of the SE, LSRRC and B Division, Balangir, Laltikra
Construction of drain and culvert at C Block along CRPF boundary wall to Primary School at Larkipali and Sadeipali RR Colony under LSIP, Balangir.
2026_CEEBO_129881_1
03/2026-27 of SE, LSRRC and B Division, Balangir
Open Tender
Civil Works - Others
Percentage
183 days
Sadeipali
Tender Cost, EMD, PAN, Valid RC, Valid GSTIN, Affidavit, No Relation Certificate, undertakings and any other document as per DTCN.
3 documents required · 3 mandatory
₹6,000
₹21,055
Yes
Office of the SE, LSRRC and B Division, Balangir,
2 Jul 2026
28 May 2026
16 Jun 2026
28 May 2026
12 Jun 2026
28 May 2026
28 May 2026 - 5 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stoney earth,gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimmimg of slopes and bed to design section and depositing the excavated materials away from works site including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 322.08 | Cum | 74.8 | ₹24,091.58 |
| 2 | Excavation of foundation in hard or gravelly soil, stiff black cotton soil & stoney earth mixedwith boulder with all leads lifts and delifts including dressing, levelling the bed and depositing the excavated materials away from the work site including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 28.07 | Cum | 276.9 | ₹7,772.58 |
| 3 | Filling foundation and plinth with sand of approved quality,watered and rammed including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 31.4 | Cum | 596.7 | ₹18,736.38 |
| 4 | Back filling of excavated earth in foundation and plinth including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 9.36 | Cum | 184.6 | ₹1,727.86 |
| 5 | Filling foundation and plinth with sand/ stone screen dust of approved quality,watered and rammed including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 46.61 | Cum | 939.5 | ₹43,790.1 |
| 6 | Cement Concrete M15 with 40 mm hard granite crusher broken aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge.(ground floor) | 32.95 | Cum | 4,958.8 | ₹1,63,392.46 |
| 7 | Cement concrete (1:1.5:3) with 12 mm hard granite crusher broken aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 1.36 | cum | 7,836.6 | ₹10,657.78 |
| 8 | RCC M20 with HG (CB) 20 mm size aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge.(ground floor) | 128.04 | Cum | 5,672.3 | ₹7,26,281.29 |
| 9 | Supply, fitting, fixing, straightening, bending, binding and placing in position of uncoated HYSD bar reinforcement complete including cost & conveyance of all materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 66.48 | Qntl | 9,302.8 | ₹6,18,450.14 |
| 10 | Rigid smooth centering and shuttering for R.C.C works including false works and dismentalling there after casting including cost, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. (a) Foundation & Plinth. | 1,183.72 | Sqm | 248.7 | ₹2,94,391.16 |
stage.html
html • 0.17 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
DTCNDrainC.pdf
Tender Documents • 2.07 MB
BOQ_592835.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .