| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.5 LAccepted-Finance | L1 | Accepted-Finance accepted | |
| 2 | L2₹30.7 L+₹18,652.67 (0.61%)Accepted-Finance | L2 | Accepted-Finance accepted |
Tender Value
₹31 L
EMD Value
₹31,000
Closing Date
12 Feb 2020, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT Renovation or Rejuvenation of Ponds and Ooranies from State Finance Commission Grants 2019 20 Shoolagiri Block TN 04 KRI 327 3 Ponds
2020_RDTN_156065_1
Roc_No_5732_2019_R4_20_01_2020
Open Tender
Civil Works - Water Works
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹31,000
DRDA Krishnagiri
15 Feb 2020
31 Jan 2020
12 Feb 2020
31 Jan 2020
12 Feb 2020
31 Jan 2020
3 Feb 2020
Amount
1.Rejuvenation of Eriebbalam Kuttai @ Eri Ebbalam H/O Ullatti - Rs. 11.00 Lakhs
Clearing the light jungle and removed away from thr site including all cutting charges and all labour chrges as per standard specification
Earth work in all type of soils except hard rock requiring blasting and conveying for formations of bund with lead of 0 m to 100m deploying earth mooving machineries of bunds, breaking, of clods, sections, complete
Earth work deploying earth moving machinaery for desiliting chan bund on eitnel and forming bund on either side and depostiting the on banks including jungle clearance
Provision for Weir
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., Complete.
Cooletion and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charegs for filling as per standard specifications etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all material and all labour charegs., etc Complete
Centering charegs for all concrete work including all cost and conveyance of all material and all labour charegs etc., Complete
Centering Below ground Level
Centering Above Ground Level
Cement Concrete 1:3:6 mix using 40mm ISS mental including cost conveyance of all material to site and all labour charegs for mixing laying and charehs etc completeb for 10 Cum
Cement Concrete 1:2:4 mix using 20mm ISS mental including cost conveyance of all material to site and all labour charegs for mixing laying and charehs etc completeb for 10 Cum
Provision for name board etc complete
Provision for Boundary Stone
2.Rejuvenation of Ettipalli Kaadu Kuttai @ Ettipalli H/O Ullatti - Rs. 10.00 Lakhs
Clearing the light jungle and removed away from thr site including all cutting charges and all labour chrges as per standard specification
Earth work in all type of soils except hard rock requiring blasting and conveying for formations of bund with lead of 0 m to 100m deploying earth mooving machineries of bunds, breaking, of clods, sections, complete
Earth work deploying earth moving machinaery for desiliting chan bund on eitnel and forming bund on either side and depostiting the on banks including jungle clearance
Provision for Weir
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., Complete.
Cooletion and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charegs for filling as per standard specifications etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all material and all labour charegs., etc Complete
Centering charegs for all concrete work including all cost and conveyance of all material and all labour charegs etc., Complete
Centering Below ground Level
Centering Above Ground Level
Cement Concrete 1:3:6 mix using 40mm ISS mental including cost conveyance of all material to site and all labour charegs for mixing laying and charehs etc completeb for 10 Cum
Cement Concrete 1:2:4 mix using 20mm ISS mental including cost conveyance of all material to site and all labour charegs for mixing laying and charehs etc completeb for 10 Cum
Provision for name board etc complete
Provision for Boundary Stone
3.Rejuvenation of Seebam Kuttai @ Seebam H/O Ullatti - Rs. 10.00 Lakhs
Clearing the light jungle and removed away from thr site including all cutting charges and all labour chrges as per standard specification
Earth work in all type of soils except hard rock requiring blasting and conveying for formations of bund with lead of 0 m to 100m deploying earth mooving machineries of bunds, breaking, of clods, sections, complete
Earth work deploying earth moving machinaery for desiliting chan bund on eitnel and forming bund on either side and depostiting the on banks including jungle clearance
Provision for Weir
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., Complete.
Cooletion and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charegs for filling as per standard specifications etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all material and all labour charegs., etc Complete
Centering charegs for all concrete work including all cost and conveyance of all material and all labour charegs etc., Complete
Centering Below ground Level
Centering Above Ground Level
Cement Concrete 1:3:6 mix using 40mm ISS mental including cost conveyance of all material to site and all labour charegs for mixing laying and charehs etc completeb for 10 Cum
Cement Concrete 1:2:4 mix using 20mm ISS mental including cost conveyance of all material to site and all labour charegs for mixing laying and charehs etc completeb for 10 Cum
Provision for name board etc complete
Provision for Boundary Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K SUBARAMANIAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .