| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.8 LAccepted-AOC | ₹24.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹24.9 L+₹15,000.01 (0.61%)Rejected-AOC | ₹24.9 L+₹15,000.01 (0.61%) | 2 | Rejected-AOC L2 |
| 3 | 3₹24.8 LSame as 1Rejected-AOC | ₹24.8 LSame as 1 | 3 | Rejected-AOC L3 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
17 Aug 2026, 4:00 pmClosed
Project Officer WSM JK LCMA
Gupt Ganga Ishber Nishat
Construction of Prefab Office Building at Watershed Management Division, JKLCMA Srinagar.
2026_HAUDD_318258_1
NIT No.02 of Watershed Management Division for building pre fab
Open Tender
Civil Works
Percentage
60 days
Gupt Ganga Ishber Nishat
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
as per nit
₹50,000
Yes
3 Sept 2026
28 Jul 2026
18 Aug 2026
28 Jul 2026
17 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge:- in all kinds of soil. | - | Cum | 1 | - |
| 2 | Laying of stone soling in foundation in horizontal on level including spreading, compacting etc. of Nominal Size 225 mm :- (Stack measurements reduced by 15%) | 1 | Cum | - | - |
| 3 | P/L in position cement concrete of specified grade including curing but excluding the cost of centring & shuttering. All work upto plinth level:-1:4:8 (1 Cement: 4 Coarse Sand: 8 Graded stone Aggregate 40 mm Nominal Size). | - | Cum | 1 | - |
| 4 | P/L in position cement concrete of specified grade including curing but excluding the cost of centring & shuttering. All work upto plinth level:- 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size). | 1 | Cum | 1 | ₹1 |
| 5Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level:- 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | |||||
| 6Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level:- Cold twisted bars. | |||||
| 7 | Centering & Shuttering including strutting, propping etc & removal of form work:- Foundations, footings, bases of columns etc. for mass concrete. | 1 | Sqm | - | - |
| 8Centering & Shuttering including strutting, propping etc & removal of form work:- Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | |||||
| 9Centering & Shuttering including strutting, propping etc & removal of form work:-Suspended floors, roofs, landings, balconies and access platforms. | |||||
| 10 | Centering & Shuttering including strutting, propping etc & removal of form work:- Edges of slabs and breaks in floors and walls
Under 20 cm wide. | 1 | R-M | 1 | ₹1 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_1047558.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .