| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | ₹3.0 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹3.0 LRejected-AOC | ₹3.0 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | J. Thonthiraj L2 | M.MAHALINGAM CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2M in light black cotton soil, hard stiff clay, stiff black cotton, hard red earth, shales, Muram, gravel stoney earth and etc., as per SS 20B.(TNBP SS No. 23 & 24) | 4.22 | cum | 133.89 ₹565.02 | 131 ₹552.82 Lowest |
| 1.02 | Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed. | 4.65 | cum | 5,282.22 ₹24,562.32 | 5,280 ₹24,552 Lowest |
| 1.03 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with all cross bracings using mild steel sheets of size 90 cm. x 60 cm. and 10 gauge stiffened, welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joist of size 10 cm x 6.5 cm dia spaced at about 90 cm. centre to centre and supported by casuarina props of 10 cm to 13 cm. dia spaced at 75 cm. centre to centre etc. complete complying with standard specification and as directed for the following items. | 57.6 | sqm | 392 ₹22,579.2 | 390 ₹22,464 Lowest |
| 1.04 | Cement Concrete 1:3:6 (One cement Three sand and Six hard brocken stone) using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed. | 6.62 | cum | 6,038.26 ₹39,973.28 | 6,036 ₹39,958.32 Lowest |
| 1.05 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials and all labour charges etc., complete. | 168.96 | sqm | 588.05 ₹99,356.93 | 586 ₹99,010.56 Lowest |
| 1.06 | Collection and supply of gritty gravel from appd quarry including cost and conveyence of all materials to site including all labour charges for filling etc., complete. | 8.49 | cum | 294.13 ₹2,497.16 | 292 ₹2,479.08 Lowest |
| 1.07 | Construction of Granular Sub base by providing well graded material(25mm to 4.75mm IRC HBG metal@65%,4.75mm to 2.36mm IRC HBG metal @ 20% and 2.36 mm below IRC HBG metal @ 15%). | 8.45 | cum | 1,212.1 ₹10,242.25 | 1,210 ₹10,224.5 Lowest |
| 1.08 | Supplying and laying inder blocking of 60 mm thick required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating (with mechanical vibrating ) finishing curing land | 74.88 | sqm | 686.11 ₹51,375.92 | 682 ₹51,068.16 Lowest |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST | 45,207.37 ₹45,207.37 | 45,055.7 ₹45,055.7 Lowest |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
2 Jul 2026, 3:00 pmClosed
Block Development Office BP
Panchayat union office,Andipatti
Providing paver block with two side drainage from arish house to vanapandi house in Marikundu village at Marikundu Panchayat under UGF 26-27
2026_RDTN_681066_8
UGF 26-27 02.07.2026
Open Tender
Civil Works - Others
Item Rate
Andipatti
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹3,000
Yes
8 Jul 2026
15 Jun 2026
2 Jul 2026
15 Jun 2026
2 Jul 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2M in light black cotton soil, hard stiff clay, stiff black cotton, hard red earth, shales, Muram, gravel stoney earth and etc., as per SS 20B.(TNBP SS No. 23 & 24) | 4.22 | cum | 131.89 | ₹556.58 |
| 1.02 | Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed. | 4.65 | cum | 5,280.22 | ₹24,553.02 |
| 1.03 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with all cross bracings using mild steel sheets of size 90 cm. x 60 cm. and 10 gauge stiffened, welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joist of size 10 cm x 6.5 cm dia spaced at about 90 cm. centre to centre and supported by casuarina props of 10 cm to 13 cm. dia spaced at 75 cm. centre to centre etc. complete complying with standard specification and as directed for the following items. | 57.6 | sqm | 390 | ₹22,464 |
| 1.04 | Cement Concrete 1:3:6 (One cement Three sand and Six hard brocken stone) using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed. | 6.62 | cum | 6,036.26 | ₹39,960.04 |
| 1.05 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials and all labour charges etc., complete. | 168.96 | sqm | 586.05 | ₹99,019.01 |
| 1.06 | Collection and supply of gritty gravel from appd quarry including cost and conveyence of all materials to site including all labour charges for filling etc., complete. | 8.49 | cum | 292.13 | ₹2,480.18 |
| 1.07 | Construction of Granular Sub base by providing well graded material(25mm to 4.75mm IRC HBG metal@65%,4.75mm to 2.36mm IRC HBG metal @ 20% and 2.36 mm below IRC HBG metal @ 15%). | 8.45 | cum | 1,210.1 | ₹10,225.34 |
| 1.08 | Supplying and laying inder blocking of 60 mm thick required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating (with mechanical vibrating ) finishing curing land | 74.88 | sqm | 684.11 | ₹51,226.16 |
| 2 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Tendernotice_2.pdf
PDF • 0.44 MB
BOQ_818475.xls
BOQ • 0.34 MB
UGF-tender-Document.pdf
Tender Documents • 1.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].