Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAdmitted-Finance | ₹2.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.6 Cr+₹89.5 L (33.5%)Admitted-Finance | ₹3.6 Cr+₹89.5 L (33.5%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | lallan singh contractor (P) ltd L1 | Mohit Yadav L2 |
|---|---|---|---|---|---|
| 1.00 | Uprooting sarpat moonj & jhunds from canal bank including its disposal. | 12,936 | M2 | 12 ₹1,55,232 Lowest | 22 ₹2,84,592 |
| 2.00 | Earth work in excavation in foundation with back filling for making profile for work with in 30m lead & 1.5 m lifts, all labour and T&P etc. complete. | 5,921.4 | M3 | 61 ₹3,61,205.4 | 58 ₹3,43,441.2 Lowest |
| 3.00 | E/W in embankment in filling in ordinary soil with average lead 200m and all lifts including ramming & dressing, all labour and T&P etc. required for proper completion of the work. | 5,945.4 | M3 | 145 ₹8,62,083 | 139 ₹8,26,410.6 Lowest |
| 4.00 | C.C. 1:3:6 (M10) in sleeper of lining in both side of Dy. Section including all cost of labour and T&P etc. complete. | 789 | M3 | 5,400 ₹42,60,600 Lowest | 6,070 ₹47,89,230 |
| 5.00 | Preparation of sub grade including all cost of labour, material and T&P etc. required for proper completion of the work. | 36,636.7 | M2 | 1 ₹36,636.7 Lowest | 11 ₹4,03,003.7 |
| 6.00 | Laying 200 micron 1st grade LDPE film(sheet) above sub grade including all labour, material and T&P etc. complete. | 41,896.8 | M2 | 1 ₹41,896.8 Lowest | 5.5 ₹2,30,432.4 |
| 7.00 | 75 mm thick C.C. 1:2:4(M-15) in lining in bed & slope of Dy. Section including mixing, laying & curing with all cost of labour, material and T&P etc. required for proper completion of the work. | 3,142.3 | M3 | 6,500 ₹2,04,24,950 Lowest | 7,070 ₹2,22,16,061 |
| 8.00 | Ordinary centering & shuttering for C.C. lining work in sleeper & patra with all labour and T&P etc. complete. | 10,193.1 | M2 | 50 ₹5,09,655 Lowest | 505 ₹51,47,515.5 |
| 9.00 | Filling construction joint of C.C. lining with bitumen sealing compound including all cost of labour, material and T&P etc. complete. | 21,901.5 | RM | 3 ₹65,704.5 Lowest | 65 ₹14,23,597.5 |
Tender Value
₹4.2 Cr
EMD Value
₹21 L
Closing Date
28 Oct 2020, 5:00 pmClosed
S.E.I.W.C. Etawah
S.E.I.W.C. Etawah
03/SE/2020-21 Lot-1
2020_UPIDC_524132_1
03/SE/2020-21 Lot-1
Open Tender
Civil Works
Item Rate
180 days
Etawah
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Executive Engineer Bhognipur Division LGC Etawah
₹21 L
Yes
12 Nov 2020
23 Oct 2020
29 Oct 2020
23 Oct 2020
28 Oct 2020
23 Oct 2020
Amount
Uprooting sarpat moonj & jhunds from canal bank including its disposal.
Earth work in excavation in foundation with back filling for making profile for work with in 30m lead & 1.5 m lifts, all labour and T&P etc. complete.
E/W in embankment in filling in ordinary soil with average lead 200m and all lifts including ramming & dressing, all labour and T&P etc. required for proper completion of the work.
C.C. 1:3:6 (M10) in sleeper of lining in both side of Dy. Section including all cost of labour and T&P etc. complete.
Preparation of sub grade including all cost of labour, material and T&P etc. required for proper completion of the work.
Laying 200 micron 1st grade LDPE film(sheet) above sub grade including all labour, material and T&P etc. complete.
75 mm thick C.C. 1:2:4(M-15) in lining in bed & slope of Dy. Section including mixing, laying & curing with all cost of labour, material and T&P etc. required for proper completion of the work.
Ordinary centering & shuttering for C.C. lining work in sleeper & patra with all labour and T&P etc. complete.
Filling construction joint of C.C. lining with bitumen sealing compound including all cost of labour, material and T&P etc. complete.
Mohit Yadav
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_788068.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .