Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 CrAccepted-AOC LOWER SICHEY NEAR FOREST CHECK POST GANGTOK 737101 EAST SIKKIM | GANGTOK | EAST SIKKIM | SIKKIM | 737101 | ₹5.1 Cr | 1 | Accepted-AOC L1 Bidder |
| 2 | 2₹5.4 Cr+₹29.8 L (5.88%)Rejected-Finance | ₹5.4 Cr+₹29.8 L (5.88%) | 2 | Rejected-Finance Bidder Rank is L2 |
| 3 | 3₹5.4 Cr+₹38.3 L (7.56%)Rejected-Finance LADAKHI MANSION BALUWAKHANI GANGTOK SIKKIM PIN 737103 | GANGTOK | EAST DISTRICT | SIKKIM | 737103 | ₹5.4 Cr+₹38.3 L (7.56%) | 3 | Rejected-Finance Bidder Rank is H1 |
Tender Value
₹5.6 Cr
EMD Value
₹16.8 L
Closing Date
4 Jul 2023, 6:00 pmClosed
CO
113 Engr Regt, c/o 99 APO
MATERIAL AND LABOUR FOR PROVISION OF EMPLACEMENT IN NORTH SIKKIM
2023_ARMY_603633_1
3334A/OT1/23-24 OF 2023-24
Open Tender
Civil Works
Lump-sum
270 days
North Sikkim
As per tender documents
6 documents required · 6 mandatory
₹0
₹16.8 L
Yes
10 Jul 2023
16 Jun 2023
5 Jul 2023
16 Jun 2023
4 Jul 2023
26 Jun 2023
Amount
Lumpsum price worked out by the contractor for building and structure as listed in Schedue A Part I
Lumpsum price worked out by the contractor for site clearance and site development as listed in Schedue A Part II
Lumpsum price worked out by the contractor for internal electrification as listed in Schedue A Part III
Note: In case doubling/duplicancy of BOQ items , the lowest quoted rate shall be applicable for payment.
SCHEDULE OF CREDIT
M/s Santosh Kumar Agarwal
LADAKHI INFRASTRUCTURE AND DEVELOPER
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .