| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-Finance | ₹3.8 L | L1 | Accepted-Finance 1st Lowest Bidder |
| 2 | L2₹3.9 LRejected-Finance | ₹3.9 L | L2 | Rejected-Finance 2nd Lowest Bidder |
| Sl No | Description | Qty | Unit | Technocrat Electrical | Perfect Power Transformer Associates |
|---|---|---|---|---|---|
| 1.00 | Partly drain out the Transformer oill up to required level from main tank for opening of electrical connection ,earthing,juper etc at 132 kv s/s Kasia | 1 | Job | 5,000 ₹5,900 | 4,500 ₹5,310 |
| 2.00 | Complete safe dismanting of the accessories of 132 /33 kv Used 40 MVA T/F-I (TAL Make ) including opening of jumpers,removal of earthing,opening of cable connection,oil pipe,Bushing,Cooling fan Marshaling Box,s,conservator tank,HV side LA ,Turret etc with proper stacking,blanking plate including bolts &nuts shall be provided by the contractor. | 1 | Job | 45,000 ₹53,100 | 45,000 ₹53,100 |
| 3.00 | Dismentaling and shifting of Used 40MVA T/F-I RTCC Panel from C&R Room including necessary Disconnection of control cables including identifaction of cable for necessary future connection and shifting the same at proper placed/store .Also Re-connection of RTCC panel,Marshaling box cable after Erection of New 63 MVA T/F as per direction of site engineer | 1 | Job | 10,000 ₹11,800 | 15,000 ₹17,700 |
| 4.00 | Packing and placing in store of HV/LV/Neutral bushing of 40MVA T/F-I in New 63MVA T/F empty wooden carets at 132 KV S/S Kasia Kushinagar | 1 | Job | 5,000 ₹5,900 | 7,500 ₹8,850 |
| 5.00 | Shifting of Used 40 MVA T/F-I from plinth to safe place up to 20 Mtrs Distance including turning to main tank if required .Including all T&P and work required to complete the job satisfactrily. | 1 | Job | 10,000 ₹11,800 | 28,000 ₹33,040 |
| 6.00 | Additional shifting 30 mtr.@ 5mtr per job | 6 | Job | 600 ₹708 | 18,000 ₹21,240 |
| 7.00 | Dismantling of used 36 KV CT(800-400/1A) of 40MVA T/F-I with the help of derrick pole ,pulley and rope arrangement ,shifting and dragging of used CT from working site to store. All cost of men T&P etc provided by contractor at his own cost for completion of work.(400109) | 3 | Nos | 3,000 ₹3,540 | 3,000 ₹3,540 |
| 8.00 | Compete erection of New 36 KV CT(1600-1250/1A) at 63MVA T/F-I LV side with the help of derrick pole ,pulley and rope ,skilled labour and T&P to complete the work satisfactory at 132 KV S/S Kasia. (200076) | 3 | Nos | 4,500 ₹5,310 | 3,000 ₹3,540 |
| 9.00 | Shifting of main tank of 63MVA, 132/33KV M/S make power transformer (ESD-) from stacking place to Erection point upto 20 mtr ,turning of tank if required, including all T&P, men and all other works required to complete the job satisfactorly at 132KV Substation Kasia,Kushinagar under ETD- I Gorakhpur. | 1 | Job | 40,000 ₹47,200 | 35,000 ₹41,300 |
| 10.00 | Additional shifting 30 mtr.@ 5mtr per job | 5 | Job | 500 ₹590 | 17,500 ₹20,650 |
Tender Value
₹5.0 L
EMD Value
₹5,000
Closing Date
2 Feb 2026, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle, UPPTCL, Pareshan Bhawan, Mohaddipur, Gorakhpur
WORK OF DISMANTLING AND SHIFTING OF OLD 40 MVA TRANSFORMER AND SHIFTING , ERECTION , CENTRIFUSING OF NEW 63 MVA TRANSFORMER AND OTHER ASSOCIATED WORK AT 132 KV S/S KASIA, KUSHINAGAR UNDER ETD I , GORAKHPUR
2026_UPTCL_1107426_1
Short Term E-Tender No. 68-ETC(G)/2025-26
Open Tender
Electrical Works
45 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC, Gorakhpur
₹5,000
6 Feb 2026
19 Jan 2026
3 Feb 2026
19 Jan 2026
2 Feb 2026
19 Jan 2026
Partly drain out the Transformer oill up to required level from main tank for opening of electrical connection ,earthing,juper etc at 132 kv s/s Kasia
Complete safe dismanting of the accessories of 132 /33 kv Used 40 MVA T/F-I (TAL Make ) including opening of jumpers,removal of earthing,opening of cable connection,oil pipe,Bushing,Cooling fan Marshaling Box,s,conservator tank,HV side LA ,Turret etc with proper stacking,blanking plate including bolts &nuts shall be provided by the contractor.
Dismentaling and shifting of Used 40MVA T/F-I RTCC Panel from C&R Room including necessary Disconnection of control cables including identifaction of cable for necessary future connection and shifting the same at proper placed/store .Also Re-connection of RTCC panel,Marshaling box cable after Erection of New 63 MVA T/F as per direction of site engineer
Packing and placing in store of HV/LV/Neutral bushing of 40MVA T/F-I in New 63MVA T/F empty wooden carets at 132 KV S/S Kasia Kushinagar
Shifting of Used 40 MVA T/F-I from plinth to safe place up to 20 Mtrs Distance including turning to main tank if required .Including all T&P and work required to complete the job satisfactrily.
Additional shifting 30 mtr.@ 5mtr per job
Dismantling of used 36 KV CT(800-400/1A) of 40MVA T/F-I with the help of derrick pole ,pulley and rope arrangement ,shifting and dragging of used CT from working site to store. All cost of men T&P etc provided by contractor at his own cost for completion of work.(400109)
Compete erection of New 36 KV CT(1600-1250/1A) at 63MVA T/F-I LV side with the help of derrick pole ,pulley and rope ,skilled labour and T&P to complete the work satisfactory at 132 KV S/S Kasia. (200076)
Shifting of main tank of 63MVA, 132/33KV M/S make power transformer (ESD-) from stacking place to Erection point upto 20 mtr ,turning of tank if required, including all T&P, men and all other works required to complete the job satisfactorly at 132KV Substation Kasia,Kushinagar under ETD- I Gorakhpur.
Additional shifting 30 mtr.@ 5mtr per job
Complete, erection of 63 MVA T/F by erection of conservator tank, radiator,all bushing with its turrets (if available), connecting of all oil pipe line, erection of cooling fans, buchholz relay,HV Side LA etc. for completing the work, topping of Transformer oil and final oil filling in tank, radiator, conservator tank and all other associates work for completion of work.All T&P provided by contractor free of cost.
Earthing of Main tank of 63 MVA T/F-I,RTCC panel,Marshaling box by using M.S flat 50x6/75x10 mm size its jointing with already laid earthmat/deltas prepairing Neutral bushing support(if required) for its earthing including all work.
Jumpring of 63 MVA T/F-I HV/LV side cutting of conductor and tightening of conductor with connector
Centrifuging of complete Transformer oil in Transformer by connecting centrifuging pipes circulating the Transformer oil through PVT. Centrifuging machine and taking the BDV value of the oil periodically till the required value is achieved. (oil capacity App. 20 KL.)
Transformer oil sample collection testing of transformer oil at CPRI or any other NABL Accredited testing Lab including cost of Transportation of each sample in standard sampling bottles
A- Break down voltage
B- Moisture Content
C- Dissolved Analysis
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
Technical68.pdf
Tender Documents • 0.62 MB
BOQ_2043843.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid