Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹31.7 LAdmitted-Finance H NO 264 1 WARD NO 03 DEULWADA PALIEM PERNEM GOA | L1 | Admitted-Finance | ||
| 2 | L2₹32.1 L+₹36,326.31 (1.15%)Admitted-Finance 118 SHIRGAL DHARGAL PERNEM GOA | NORTH GOA | GOA | 403001 | L2 | Admitted-Finance |
Tender Value
₹30.3 L
EMD Value
₹60,544
Closing Date
18 Sept 2026, 5:00 pmClosed
Chief Officer
MMC,Mapusa
Construction of a Composting Unit for the processing of wet waste at the MSW site in Cunchelim, Mapusa.
2026_MC_31521_1
13/MMC/Engg/9215(2)/2026-27
Open Tender
Civil Works
Percentage
120 days
Mapusa
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹60,544
16 Oct 2026
3 Sept 2026
21 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a) All kinds of soil | 62.73 | Cu.m. | 291 | ₹18,254.43 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 53.26 | Cu.m. | 2,211 | ₹1,17,757.86 |
| 3 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and fiishing in: a) All works upto plinth level | 98.37 | Cu.m. | 6,810 | ₹6,69,899.7 |
| 4 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 19.35 | Cu.m. | 5,186 | ₹1,00,349.1 |
| 5Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | |||||
| 5.01 | a) All works upto plinth level | 15.04 | Cu.m. | 7,178 | ₹1,07,957.12 |
| 5.02 | b) In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level. | 5.13 | Cu.m. | 8,034 | ₹41,214.42 |
| 6Centering & shuttering including Strutting, Propping & removal of forms for : | |||||
| 6.01 | i) Foundations, Footings, Bases for columns | 22.4 | Sq.m. | 407 | ₹9,116.8 |
| 6.02 | ii) Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like | 79.66 | Sq.m. | 479 | ₹38,157.14 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_31904.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .