Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | Rejected-Technical NO 163 LAKSHMI AMMAN KOIL ST NEITHAVAYAL MINJUR PONNERI | PONNERI | TIRUVALLUR | TAMIL NADU | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | V S S Enterprises L2 | P.BHARATHIRAJA L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. as per standard specifications 20B. | 64 | m3 | 500 ₹32,000 | 245 ₹15,680 Lowest |
| 2.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 7 | m3 | 6,500 ₹45,500 | 5,980 ₹41,860 Lowest |
| 3.00 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 16 | m3 | 1,971 ₹31,536 Lowest | 1,971 ₹31,536 Lowest |
| 4.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 7 | m3 | 1,971 ₹13,797 Lowest | 1,971 ₹13,797 Lowest |
| 5.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best II Class Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | - | - | - | - |
| 5.10 | Foundation & Basement | 15 | m3 | 7,851.1 ₹1,17,766.5 Lowest | 7,851.1 ₹1,17,766.5 Lowest |
| 5.20 | Above Basement -For Superstructure | 22 | m3 | 7,937.89 ₹1,74,633.58 Lowest | 7,937.89 ₹1,74,633.58 Lowest |
| 6.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casuarinas props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items. | - | - | - | - |
| 6.10 | For Column | 44 | m2 | 1,335.34 ₹58,754.96 Lowest | 1,335.34 ₹58,754.96 Lowest |
| 6.20 | For Tie Beam (Grade Beam) | 24 | m2 | 538.71 ₹12,929.04 Lowest | 538.71 ₹12,929.04 Lowest |
Tender Value
₹16.5 L
EMD Value
₹16,500
Closing Date
24 Oct 2025, 3:00 pmClosed
EXECUTIVE OFFICER ARANI TOWN PANCHAYAT
EXECUTIVE OFFICER ARANI TOWN PANCHAYAT
Construction of Anganwadi Building at New Iurlar Colony Ward No-14 Survey No-456 in Arani Town Panchayat.
2025_DTP_615965_1
229-1/2025/A2
Open Tender
Civil Works - Buildings
Works
180 days
Construction of Anganwadi Building at New Iurlar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,500
Yes
ARANI TOWN PANCHAYAT OFFICE
26 Oct 2025
21 Oct 2025
24 Oct 2025
21 Oct 2025
24 Oct 2025
21 Oct 2025
23 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_736022.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_736022.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .