| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | L1 | Accepted-AOC Work was Awarded | |
| 2 | L2₹4.1 L+₹62,519.24 (18.2%)Rejected-AOC TUTICORIN | L2 | Rejected-AOC Work was not Awarded |
| Sl No | Description | Qty | Unit | CKEE ENGINEERING PRIVATE LIMITED L1 | BLUE MOUNTAIN L2 |
|---|---|---|---|---|---|
| 1.00 | Overhauling of the BFP coolers : Charges for removing the cooler pipe line and cooler from the motor. Dismantling the cooler cover, cleaning the cooler tubes by wire brush, air and with water. Changing the gaskets and reassembling it, checking the cooler tubes for leak, hydraulic testing of cooler with 4 Kgf / cm2 pressure for six hour duration and reerecting the cooler. Checking the motor terminal tightness and taking IR value and PI value. (Including cost of high grade nitrile rubber gasket and Anti corrosive paint | 3 | Nos | 98,121 ₹1,15,782.78 Lowest | 1,15,962 ₹1,36,835.16 |
| 2.00 | Charges for removal and refixing of floor grills at 15.5 mt level for lifting and re-erecting the coolers in the HT Motors :
Removal of floor M.S. grills at 15.5 mt level by EOT Crane after providing adequate barricades for safety measure to lift coolers from the motors and refixing the M.S.grills in position. After completion of work, Removal of M.S. grills by EOT crane at 15.5 mt level after providing adequate barricades for safety measure to reerect the coolers in their motors and refixing the floor M.S. grill in its position. (Including Cost of Consumables and hire charges for T&P etc.) | 5 | Nos | 20,530 ₹24,225.4 Lowest | 24,265 ₹28,632.7 |
| 3.00 | Charges for carrying out an capital maintenance works in Boiler Feed Pump Motors 5 B (S.No. 32275 – A – 401 – 01 – 01)
“Disconnection of Power cables at Phase & Neutral side, space heater cable” in Boiler Feed Pump motor. | 1 | No | 4,066 ₹4,797.88 Lowest | 4,805 ₹5,669.9 |
| 4.00 | Removal of foundation bolts, Lifting the motor to a convenient location. | 1 | No | 12,830 ₹15,139.4 Lowest | 15,162 ₹17,891.16 |
| 5.00 | Replacement of CT and terminal box (Replacement of CT/PT in LT module and LT Breaker panel) : Charges for releasing the 3 Nos of 500/1 amp C.T, dismantling of phase & neutral side terminal boxes, dismantling of spare heater terminal box and other dummies from the released motor. Refixing the terminal boxes, dummies in the spare overhauled motor. Reassembling of 3 Nos 500/1 amp. Current transformers etc. in the spare motor | 1 | No | 2,677 ₹3,158.86 Lowest | 3,164 ₹3,733.52 |
| 6.00 | Lifting and Erection of the motor back on its bed after cleaning and checking healthiness of pedestal insulation. | 1 | No | 12,830 ₹15,139.4 Lowest | 15,162 ₹17,891.16 |
| 7.00 | Removal of end covers and measuring the air gap and magnetic axis. | 1 | No | 2,758 ₹3,254.44 Lowest | 3,260 ₹3,846.8 |
| 8.00 | Overhaul of stator :
Inspection and cleaning and checking of stator windings, fastening of the stator winding to the end ring and also the inter coil spacers and packing in the overhang portion of the windings, tightening the wedges, spraying one coat of Dr. Beck protective enamel varnish, Drying out the stator, preheating, Checking the IR value, DC resistance and Tan delta. packing in the overhang portion of the windings, tightening the wedges, spraying one coat of Dr. Beck protective enamel varnish, Drying out the stator, preheating, Checking the IR value, DC resistance and Tan delta. | 1 | No | 63,028 ₹74,373.04 Lowest | 74,488 ₹87,895.84 |
| 9.00 | Overhaul of Rotor :
Inspection and cleaning of released rotor, checking the position of stampings, cleaning of corroded parts, inspection of winding bars, cleaning of overheated and burnt places, applying one coat of Dr. Beck’s insulating varnish and drying out. | 1 | No | 18,510 ₹21,841.8 Lowest | 21,875 ₹25,812.5 |
| 10.00 | Reassembling the motor complete : Assembling the end covers, checking air gap and magnetic axis. | 1 | No | 2,758 ₹3,254.44 Lowest | 3,260 ₹3,846.8 |
Tender Value
Refer Docs
EMD Value
₹3,500
Closing Date
4 Aug 2025, 2:00 pmClosed
CE/TTPS
Chief Engineer / TTPS, Tuticorin
TTPS ES Circle EM III Unit V Annual maintenance of BFPs motor coolers and CEP 5B motor and Capital Overhauling of Boiler Feed Pump motor 5B and Condensate Extraction Pump Motor 5A during Annual Overhauling for the year 2025 2026 or their after
2025_EB_583648_1
CE/SE/ES/TTPS/No.125/2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
25 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹3,500
Yes
27 Oct 2025
19 Jul 2025
5 Aug 2025
19 Jul 2025
4 Aug 2025
19 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .