Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Fee/PreQual/Technical/Finance NA | -28.10% | ₹5.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.1 L+₹24,100.69 (4.10%)Admitted-Fee/PreQual/Technical/Finance SOUTH MADA STREET | CHENNAI | TAMIL NADU | 600001 | -25.15% | ₹6.1 L+₹24,100.69 (4.10%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.3 L+₹38,397.71 (6.54%)Admitted-Fee/PreQual/Technical/Finance | -23.40% | ₹6.3 L+₹38,397.71 (6.54%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.9 L+₹98,935.37 (16.8%)Admitted-Fee/PreQual/Technical/Finance | -15.99% | ₹6.9 L+₹98,935.37 (16.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹6.9 L+₹1.1 L (18.2%)Admitted-Fee/PreQual/Technical/Finance | -14.99% | ₹6.9 L+₹1.1 L (18.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.2 L
EMD Value
₹8,200
Closing Date
17 Jul 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
IMPROVEMENTS TO THE EXISTING CENTRE MEDIAN MEDIAN AND TRAFFIC ISLAND WITH GREENERY ARRANGEMENTS AT NEW AVADI ROAD IN DIV 95 UNIT 21 ZONE 08
2026_CoC_684137_1
Z.O.VIII.C.NO.E1/5188/2026
Open Tender
Civil Works
Works
90 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,200
17 Jul 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all kinds ...nd removal of excavated earth from site complete) | 102 | CUM | 260.79 | ₹26,600.58 |
| 2 | Supply & stacking of red earth at site to the depa...tacking and inclusive of all taxes etc., complete. | 34 | CUM | 3,750 | ₹1,27,500 |
| 3 | Supply of well decomposed Farm yard Manure in a po... highly nutrient and which supports plant growth. | 34 | CUM | 2,400 | ₹81,600 |
| 4 | Supply and stacking of pit sand / earth filling s...eposits and should clean whithout solid particles | 34 | CUM | 486.7 | ₹16,547.8 |
| 5 | Mixing charges of Red soil, sand and manure unifor...ation of soil mixture (excluding material cost) | 102 | CUM | 116 | ₹11,832 |
| 6 | Spreading of red soil, gravel or sand including wa...5 mm thickness - including hire charges of roller. | 102 | CUM | 41.12 | ₹4,194.24 |
| 7 | Painting the wall two coats with approved weather ...tion and as directed by the departmental officers. | 424 | SQM | 260.88 | ₹1,10,613.12 |
| 8 | Manufacturing, Supplying and Fixing of Stainless S...onveyance, electrical charges, etc. complete | 48 | SQM | 5,536 | ₹2,65,728 |
| 9 | Planting of Bougainvillea hybrid foliage shrub v...vated earth etc as directed by the site in-charge. | 770 | EACH | 214 | ₹1,64,780 |
| 10 | Art work as per the direction of department offici...quired (Relevent ISI STD), including putty works. | 14 | SQM | 541.2 | ₹7,576.8 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_822394.xls
BOQ • 0.28 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .