| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.1 CrAdmitted-Finance | ₹84.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹89.7 Cr+₹5.6 Cr (6.72%)Admitted-Finance 1 PARSWADA POST SHAHAGANJ VILLAGE | INDORE | INDORE | MADHYA PRADESH | ₹89.7 Cr+₹5.6 Cr (6.72%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SUEZ India Pvt. Ltd. L1 | VA TECH WABAG LTD L2 |
|---|---|---|---|---|---|
| 1.01 | Fixed components (1st year): (a) Cost of 172 Trained personnel for WTP operations and maintenance, SCADA,analyzers, horticulture, security, lab including Safety kits, Uniforms, training, mock drills, logsheets etc. (b) Comprehensive Maintenance including upgradation, modernization of SCADA, PLC system, RTU and I/Os as per OEM guidelines of Make- Schneider installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (c) Comprehensive Maintenance of Analysers including periodic calibration, replacement of electrolyte, membrane caps, faulty parts, quality audit report generation as per OEM guidelines, Make- E&H installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (d) Cost of Maintenance of all E&M equipments including Preventive & breakdown maintenance, CCTV, APFC panels, Flow meters, Calibration and testing, disposal of silt/sand, meeting functional guarantees, BIS standard for potable water, insurance of assets, upkeep of building, offices and civil works of roads, drains, painting, horticulture works, lab equipments, testing, spares, consumables, tools and tackles and other allied works required for smooth operation of Bhagirathi WTP and Sangam RWPH, Cost of updating O&M Manual and Cost of laboratory & testing. (Indicative list of equipments attached). (e) Reserve Fund for Major maintenance and replacement of E&M equipments at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. | 1 | Job | 17,39,76,699 ₹20,52,92,504.82 | 8,02,40,000 ₹9,46,83,200 Lowest |
| 1.02 | Variable component (1st year) : Cost of chemicals required for water treatment of rated output 110 MGD | 1 | Job | 2,91,45,063 ₹3,43,91,174.34 Lowest | 7,18,00,000 ₹8,47,24,000 |
| 1.03 | Fixed components (2nd year): (a) Cost of 172 Trained personnel for WTP operations and maintenance, SCADA,analyzers, horticulture, security, lab including Safety kits, Uniforms, training, mock drills, logsheets etc. (b) Comprehensive Maintenance including upgradation, modernization of SCADA, PLC system, RTU and I/Os as per OEM guidelines of Make- Schneider installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (c) Comprehensive Maintenance of Analysers including periodic calibration, replacement of electrolyte, membrane caps, faulty parts, quality audit report generation as per OEM guidelines, Make- E&H installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (d) Cost of Maintenance of all E&M equipments including Preventive & breakdown maintenance, CCTV, APFC panels, Flow meters, Calibration and testing, disposal of silt/sand, meeting functional guarantees, BIS standard for potable water, insurance of assets, upkeep of building, offices and civil works of roads, drains, painting, horticulture works, lab equipments, testing, spares, consumables, tools and tackles and other allied works required for smooth operation of Bhagirathi WTP and Sangam RWPH, Cost of updating O&M Manual and Cost of laboratory & testing. (Indicative list of equipments attached). (e) Reserve Fund for Major maintenance and replacement of E&M equipments at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. | 1 | Job | 9,63,50,036 ₹11,36,93,042.48 | 8,02,40,000 ₹9,46,83,200 Lowest |
| 1.04 | Variable component (2nd year): Cost of chemicals required for water treatment of rated output 110 MGD | 1 | Job | 2,91,45,063 ₹3,43,91,174.34 Lowest | 7,18,00,000 ₹8,47,24,000 |
| 1.05 | Fixed components (3rd Year): (a) Cost of 172 Trained personnel for WTP operations and maintenance, SCADA,analyzers, horticulture, security, lab including Safety kits, Uniforms, training, mock drills, logsheets etc. (b) Comprehensive Maintenance including upgradation, modernization of SCADA, PLC system, RTU and I/Os as per OEM guidelines of Make- Schneider installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (c) Comprehensive Maintenance of Analysers including periodic calibration, replacement of electrolyte, membrane caps, faulty parts, quality audit report generation as per OEM guidelines, Make- E&H installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (d) Cost of Maintenance of all E&M equipments including Preventive & breakdown maintenance, CCTV, APFC panels, Flow meters, Calibration and testing, disposal of silt/sand, meeting functional guarantees, BIS standard for potable water, insurance of assets, upkeep of building, offices and civil works of roads, drains, painting, horticulture works, lab equipments, testing, spares, consumables, tools and tackles and other allied works required for smooth operation of Bhagirathi WTP and Sangam RWPH, Cost of updating O&M Manual and Cost of laboratory & testing. (Indicative list of equipments attached). (e) Reserve Fund for Major maintenance and replacement of E&M equipments at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. | 1 | Job | 9,99,30,001 ₹11,79,17,401.18 | 8,02,40,000 ₹9,46,83,200 Lowest |
| 1.06 | Variable component (3rd Year) : Cost of chemicals required for water treatment of rated output 110 MGD | 1 | Job | 2,91,45,063 ₹3,43,91,174.34 Lowest | 7,18,00,000 ₹8,47,24,000 |
| 1.07 | Fixed components (4th Year): (a) Cost of 172 Trained personnel for WTP operations and maintenance, SCADA,analyzers, horticulture, security, lab including Safety kits, Uniforms, training, mock drills, logsheets etc. (b) Comprehensive Maintenance including upgradation, modernization of SCADA, PLC system, RTU and I/Os as per OEM guidelines of Make- Schneider installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (c) Comprehensive Maintenance of Analysers including periodic calibration, replacement of electrolyte, membrane caps, faulty parts, quality audit report generation as per OEM guidelines, Make- E&H installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (d) Cost of Maintenance of all E&M equipments including Preventive & breakdown maintenance, CCTV, APFC panels, Flow meters, Calibration and testing, disposal of silt/sand, meeting functional guarantees, BIS standard for potable water, insurance of assets, upkeep of building, offices and civil works of roads, drains, painting, horticulture works, lab equipments, testing, spares, consumables, tools and tackles and other allied works required for smooth operation of Bhagirathi WTP and Sangam RWPH, Cost of updating O&M Manual and Cost of laboratory & testing. (Indicative list of equipments attached). (e) Reserve Fund for Major maintenance and replacement of E&M equipments at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. | 1 | Job | 9,64,43,700 ₹11,38,03,566 | 8,02,40,000 ₹9,46,83,200 Lowest |
| 1.08 | Variable component (4th Year): Cost of chemicals required for water treatment of rated output 110 MGD | 1 | Job | 2,91,45,063 ₹3,43,91,174.34 Lowest | 7,18,00,000 ₹8,47,24,000 |
| 1.09 | Fixed components (5th Year): (a) Cost of 172 Trained personnel for WTP operations and maintenance, SCADA,analyzers, horticulture, security, lab including Safety kits, Uniforms, training, mock drills, logsheets etc. (b) Comprehensive Maintenance including upgradation, modernization of SCADA, PLC system, RTU and I/Os as per OEM guidelines of Make- Schneider installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (c) Comprehensive Maintenance of Analysers including periodic calibration, replacement of electrolyte, membrane caps, faulty parts, quality audit report generation as per OEM guidelines, Make- E&H installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (d) Cost of Maintenance of all E&M equipments including Preventive & breakdown maintenance, CCTV, APFC panels, Flow meters, Calibration and testing, disposal of silt/sand, meeting functional guarantees, BIS standard for potable water, insurance of assets, upkeep of building, offices and civil works of roads, drains, painting, horticulture works, lab equipments, testing, spares, consumables, tools and tackles and other allied works required for smooth operation of Bhagirathi WTP and Sangam RWPH, Cost of updating O&M Manual and Cost of laboratory & testing. (Indicative list of equipments attached). (e) Reserve Fund for Major maintenance and replacement of E&M equipments at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. | 1 | Job | 9,99,03,183 ₹11,78,85,755.94 | 8,02,40,000 ₹9,46,83,200 Lowest |
| 1.10 | Variable component (5th Year): Cost of chemicals required for water treatment of rated output 110 MGD | 1 | Job | 2,91,45,063 ₹3,43,91,174.34 Lowest | 7,18,00,000 ₹8,47,24,000 |
Tender Value
Refer Docs
EMD Value
₹20 L
Closing Date
16 Jun 2026, 3:00 pmClosed
EE(EM)BP 110 MGD Bhagirathi WTP Gokalpuri Delhi-94
EE(EM)BP 110 MGD Bhagirathi WTP Gokalpuri Delhi-94
Operations and Comprehensive Maintenance of the 110 (100plus10) MGD Bhagirathi Water Treatment Plant including Sangam Raw Water Pump House, Delhi for 5 years (Re-invite)
2026_DJB_291232_1
NIT No.02 (2026-27)
Open Tender
Miscellaneous Works
Item Rate
1827 days
EE(EM)BP 110 MGD Bhagirathi WTP Gokalpuri Delhi-94
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
A/c No.50448339804
₹20 L
Office of CE (WW)-I,E-I,Type-IV, SQ JW,KB,ND-05
30 Jun 2026
12 May 2026
16 Jun 2026
12 May 2026
16 Jun 2026
12 May 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Fixed components (1st year): (a) Cost of 172 Trained personnel for WTP operations and maintenance, SCADA,analyzers, horticulture, security, lab including Safety kits, Uniforms, training, mock drills, logsheets etc. (b) Comprehensive Maintenance including upgradation, modernization of SCADA, PLC system, RTU and I/Os as per OEM guidelines of Make- Schneider installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (c) Comprehensive Maintenance of Analysers including periodic calibration, replacement of electrolyte, membrane caps, faulty parts, quality audit report generation as per OEM guidelines, Make- E&H installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (d) Cost of Maintenance of all E&M equipments including Preventive & breakdown maintenance, CCTV, APFC panels, Flow meters, Calibration and testing, disposal of silt/sand, meeting functional guarantees, BIS standard for potable water, insurance of assets, upkeep of building, offices and civil works of roads, drains, painting, horticulture works, lab equipments, testing, spares, consumables, tools and tackles and other allied works required for smooth operation of Bhagirathi WTP and Sangam RWPH, Cost of updating O&M Manual and Cost of laboratory & testing. (Indicative list of equipments attached). (e) Reserve Fund for Major maintenance and replacement of E&M equipments at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. | 1 | Job | 80 | ₹80 |
| 1.02 | Variable component (1st year) : Cost of chemicals required for water treatment of rated output 110 MGD | 1 | Job | 80 | ₹80 |
| 1.03 | Fixed components (2nd year): (a) Cost of 172 Trained personnel for WTP operations and maintenance, SCADA,analyzers, horticulture, security, lab including Safety kits, Uniforms, training, mock drills, logsheets etc. (b) Comprehensive Maintenance including upgradation, modernization of SCADA, PLC system, RTU and I/Os as per OEM guidelines of Make- Schneider installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (c) Comprehensive Maintenance of Analysers including periodic calibration, replacement of electrolyte, membrane caps, faulty parts, quality audit report generation as per OEM guidelines, Make- E&H installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (d) Cost of Maintenance of all E&M equipments including Preventive & breakdown maintenance, CCTV, APFC panels, Flow meters, Calibration and testing, disposal of silt/sand, meeting functional guarantees, BIS standard for potable water, insurance of assets, upkeep of building, offices and civil works of roads, drains, painting, horticulture works, lab equipments, testing, spares, consumables, tools and tackles and other allied works required for smooth operation of Bhagirathi WTP and Sangam RWPH, Cost of updating O&M Manual and Cost of laboratory & testing. (Indicative list of equipments attached). (e) Reserve Fund for Major maintenance and replacement of E&M equipments at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. | 1 | Job | 80 | ₹80 |
| 1.04 | Variable component (2nd year): Cost of chemicals required for water treatment of rated output 110 MGD | 1 | Job | 80 | ₹80 |
| 1.05 | Fixed components (3rd Year): (a) Cost of 172 Trained personnel for WTP operations and maintenance, SCADA,analyzers, horticulture, security, lab including Safety kits, Uniforms, training, mock drills, logsheets etc. (b) Comprehensive Maintenance including upgradation, modernization of SCADA, PLC system, RTU and I/Os as per OEM guidelines of Make- Schneider installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (c) Comprehensive Maintenance of Analysers including periodic calibration, replacement of electrolyte, membrane caps, faulty parts, quality audit report generation as per OEM guidelines, Make- E&H installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (d) Cost of Maintenance of all E&M equipments including Preventive & breakdown maintenance, CCTV, APFC panels, Flow meters, Calibration and testing, disposal of silt/sand, meeting functional guarantees, BIS standard for potable water, insurance of assets, upkeep of building, offices and civil works of roads, drains, painting, horticulture works, lab equipments, testing, spares, consumables, tools and tackles and other allied works required for smooth operation of Bhagirathi WTP and Sangam RWPH, Cost of updating O&M Manual and Cost of laboratory & testing. (Indicative list of equipments attached). (e) Reserve Fund for Major maintenance and replacement of E&M equipments at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. | 1 | Job | 80 | ₹80 |
| 1.06 | Variable component (3rd Year) : Cost of chemicals required for water treatment of rated output 110 MGD | 1 | Job | 80 | ₹80 |
| 1.07 | Fixed components (4th Year): (a) Cost of 172 Trained personnel for WTP operations and maintenance, SCADA,analyzers, horticulture, security, lab including Safety kits, Uniforms, training, mock drills, logsheets etc. (b) Comprehensive Maintenance including upgradation, modernization of SCADA, PLC system, RTU and I/Os as per OEM guidelines of Make- Schneider installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (c) Comprehensive Maintenance of Analysers including periodic calibration, replacement of electrolyte, membrane caps, faulty parts, quality audit report generation as per OEM guidelines, Make- E&H installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (d) Cost of Maintenance of all E&M equipments including Preventive & breakdown maintenance, CCTV, APFC panels, Flow meters, Calibration and testing, disposal of silt/sand, meeting functional guarantees, BIS standard for potable water, insurance of assets, upkeep of building, offices and civil works of roads, drains, painting, horticulture works, lab equipments, testing, spares, consumables, tools and tackles and other allied works required for smooth operation of Bhagirathi WTP and Sangam RWPH, Cost of updating O&M Manual and Cost of laboratory & testing. (Indicative list of equipments attached). (e) Reserve Fund for Major maintenance and replacement of E&M equipments at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. | 1 | Job | 80 | ₹80 |
| 1.08 | Variable component (4th Year): Cost of chemicals required for water treatment of rated output 110 MGD | 1 | Job | 80 | ₹80 |
| 1.09 | Fixed components (5th Year): (a) Cost of 172 Trained personnel for WTP operations and maintenance, SCADA,analyzers, horticulture, security, lab including Safety kits, Uniforms, training, mock drills, logsheets etc. (b) Comprehensive Maintenance including upgradation, modernization of SCADA, PLC system, RTU and I/Os as per OEM guidelines of Make- Schneider installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (c) Comprehensive Maintenance of Analysers including periodic calibration, replacement of electrolyte, membrane caps, faulty parts, quality audit report generation as per OEM guidelines, Make- E&H installed at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. (d) Cost of Maintenance of all E&M equipments including Preventive & breakdown maintenance, CCTV, APFC panels, Flow meters, Calibration and testing, disposal of silt/sand, meeting functional guarantees, BIS standard for potable water, insurance of assets, upkeep of building, offices and civil works of roads, drains, painting, horticulture works, lab equipments, testing, spares, consumables, tools and tackles and other allied works required for smooth operation of Bhagirathi WTP and Sangam RWPH, Cost of updating O&M Manual and Cost of laboratory & testing. (Indicative list of equipments attached). (e) Reserve Fund for Major maintenance and replacement of E&M equipments at Muradnagar intake, Bhagirathi WTP and its command area UGRs and Sangam RWPH. | 1 | Job | 80 | ₹80 |
| 1.1 | Variable component (5th Year): Cost of chemicals required for water treatment of rated output 110 MGD | 1 | Job | 80 | ₹80 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.68 MB
BOQ_386493.xls
BOQ • 0.27 MB
CorrigendumDateExten16062026.pdf
PDF • 0.03 MB
Prebidreply.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .