| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 LAdmitted-Finance | ₹3.0 L | L2 | Admitted-Finance |
| 3 | L3₹3.2 LAdmitted-Finance | ₹3.2 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Expierence Cert. not submitted |
| Sl No | Description | Qty | Unit | M/S BHAT ELECTRICALS L2 | HANJI ELECTRONICS L1 | M/s ZAHID CONTRACTORS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply , Carriage upto site,installation ,testing & commissioning of 11/0.433kV, 63 KVA , 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Efficient Level-2, Al. wound , and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. | 1 | No. | 1,65,000 ₹1.6 L | 1,41,000 ₹1.4 L | 2,00,000 ₹2 L |
| 2.00 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 9 Mtr Long (410-SP-33) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 1 | No. | 16,500 ₹16,500 | 22,000 ₹22,000 | 25,000 ₹25,000 |
| 3.00 | Supply , installation ,testing , commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mmas per REC specifications. | 3 | No. | 14,500 ₹43,500 | 333 ₹999 | 200 ₹600 |
| 4.00 | Supply & laying, testing ,commissioning of 120 mm² single core Cable,1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type | 30 | Mtrs | 350 ₹10,500 | 745 ₹22,350 | 300 ₹9,000 |
| 5.00 | Supply & fixing of GI nuts and bolts of sizes | 10 | Kgs | 150 ₹1,500 | 200 ₹2,000 | 200 ₹2,000 |
| 6.00 | Supply , installation ,testing & commissioning of --Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover as per REC standard. | 3 | No | 350 ₹1,050 | 3,000 ₹9,000 | 300 ₹900 |
| 7.00 | Cement bottoming of S T Ploes 9Mtrs long in 1:2:4 mix, 0.48 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 1 | No | 3,500 ₹3,500 | 1,500 ₹1,500 | 1,000 ₹1,000 |
| 8.00 | Supply and Painting of poles with one coat of redoxide and two coats of Aluminium paint of standard quality including Marking of Poles | 1 | No | 650 ₹650 | 1,500 ₹1,500 | 1,000 ₹1,000 |
| 9.00 | Supply , installation ,testing & commissioning of pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm as per REC standard. | 1 | No | 850 ₹850 | 2,500 ₹2,500 | 1,000 ₹1,000 |
| 10.00 | Supply , installation ,testing & commissioning of Sundry items like Aluminium lugs, Jumpers, binding Tape, | 1 | LS | 100 ₹100 | 2,300 ₹2,300 | 1,200 ₹1,200 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹5,800
Closing Date
17 Dec 2025, 4:00 pmClosed
Executive Engineer ED Handwara
Office of Executive Engineer ED Handwara
Installation of 63kva Transformer with poles and wire at new bablu Mohalla Ganipora under District Capex Budget (PRI) 2025-26 of ED Handwara
2025_PDD_295820_1
e-NIT 61 of 2025-26
Open Tender
Electrical Works
90 days
Office of Executive Engineer ED Handwara
Refer to SBD
2 documents required · 2 mandatory
₹500
Office of Executive Engineer ED Handwara
₹5,800
29 Dec 2025
20 Nov 2025
18 Dec 2025
21 Nov 2025
17 Dec 2025
21 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.27 MB
Document
0.98 MB
BOQ
BOQ • 0.32 MB
Download all tender documents and submit your bid