| 1 | L1₹9.8 CrAccepted-Finance | ₹9.8 Cr | L1 | Accepted-Finance Lowest |
| 2 | L2₹10.3 CrAccepted-Finance | ₹10.3 Cr | L2 | Accepted-Finance Highest |
Tender Value
₹10 Cr
EMD Value
₹10 L
Closing Date
10 Jan 2024, 4:00 pmClosed
Executive Engineer, PWD, Tali division
Office of Executive Engineer, PWD, Tali division
C/o Road from Rikung in Upper Subansiri District to Tedung via Pilua in Kra Daadi District (60 Km) (PH-III)
2023_PWDAP_1518_1
TD/W-12/RIDF/2023-24/ 03
Open Tender
Civil Works – Roads
Item Rate
548 days
Rikung to Tedung
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
EE PWD Tali Division
₹10 L
Yes
11 Jan 2024
28 Dec 2023
11 Jan 2024
28 Dec 2023
10 Jan 2024
28 Dec 2023
Amount
SH : PAVEMENT WORKS GSB (L-21.00 KM)
B) By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
SH:- CROSS DRAINAGE a) RCC S/ Culvert 1.00 m Span - 1.5 Ht)-15 Nos
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort )
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 Height upto 5m
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
b) RCC S/ Culvert 2.00 m Span - 1.5 Ht)-20 Nos
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort )
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 Height upto 5m
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications Add for Cartage of Materials (As per TC)
SH:- Protection Works a) Retaining Wall=290.00M
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification Random Rubble Masonry
Dry rubble Flooring
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material
b) Breast Wall=262.00M
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification Random Rubble Masonry
Dry rubble Flooring
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material
SH: C C Drain L=3.00 Km)
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m.
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring an shuttering in:a) Foundations and plinth
Centering and shuttering including strutting , propping etc, and removal of form work for :- b) Walls including attached buttresses, pilasters etc.
12 mm Cement plaster in CM 1:4 (1 Cement : 4 Sand)
Neat Cement Punning
E and K Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1655.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].