| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.1 LAdmitted-Fee/PreQual/Technical/Finance | -1.00% | ₹7.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.2 L
EMD Value
₹71,838
Closing Date
5 May 2026, 3:00 pmClosed
Chief Engineer
Nagar Nigam, Motijheel Kanpur
Supply of equipment used in Pooja at Pooja Sthal Nawabganj Under Zone-6.
2026_NNKAN_1144774_1
506/UDYAN/2024-25
Open Tender
Civil Works
Fixed-rate
45 days
Motijheel
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹71,838
12 Jun 2026
4 May 2026
5 May 2026
4 May 2026
5 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., inciuding welding, grinding, buffing, polishing and making curvature (wherever required) anc fitting thesame with necessary stainless steel nuts and bolts |complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners stainleSs steei bolts etC., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, |(for payment purpose only weight of stainless steel members shall be considered excluding fixing 1accessories Such as nuts, bolts, fasteners etc.). | 0.8 | Kg | 620 | ₹495.38 |
| 2 | Excavation in foundation in ordinary soii (loam
clay or sand) including lift upto 1.50 meter and
lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches.PWD-251 | 1.5 | Cum | 170 | ₹255 |
| 3 | Prov & laying in position cement concrete 1:4:8
lexcluding the cost of centering and shuttering
All work up to plinthlevel :1:4:8 (1 Cement: 4 coarse sand: 8 graded stone aggregate 40mm
norminal size) SOR 1.4.8 | - | Cum | 5,740 | - |
| 4 | Providing and laying in cement concrete 1:1.5:3
upto plinth level SOR 4.1.2 | - | Cum | 7,160 | - |
| 5 | Steel reinforcement for RCC works SOR 5.22.6 | 397.41 | kg | - | - |
| 6 | Dismantling reinforced cement concrete reinforced brick including stacking of dismantled materials as directed by engineer in charge within a diameter of 60 meters. SOR 694 | - | Cum | 1,200 | - |
| 7 | Providing and laying in cement concrete 1:1.5:3
above plinth level. and curing complete, upto floor IV SOR 4.2.2 | - | Cum | 8,400 | - |
| 8 | 80 diyas 5 brass bells and required anemeties for arti and rental musiC System | 1 | Job | 3,00,000 | ₹3,00,000 |
| 9 | GST 18% | 1 | Tax | 1,09,582.36 | ₹1,09,582.36 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.60 MB
BOQ_2139206.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .