| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAccepted-AOC | ₹4.2 Cr | L1 | Accepted-AOC ok |
| 2 | L2₹4.3 Cr+₹14.2 L (3.39%)Rejected-Finance | ₹4.3 Cr+₹14.2 L (3.39%) | L2 | Rejected-Finance Higest Rate |
| 3 | L3₹4.4 Cr+₹20.4 L (4.85%)Rejected-Finance | ₹4.4 Cr+₹20.4 L (4.85%) | L3 | Rejected-Finance Higest Rate |
| 4 | L4₹4.7 Cr+₹50.5 L (12.0%)Rejected-Finance | ₹4.7 Cr+₹50.5 L (12.0%) | L4 | Rejected-Finance Higest Rate |
| 5 | Rejected-Technical | - | - | Rejected-Technical Second Partner Does Not Have Work Experience And Also Average Annual Construction Tornover Is Not As Per Joint Venture Conditions Averae Annual Construction Tornover is less than 50 Percentage |
| Sl No | Description | Qty | Unit | goutam gouri construction company L2 | ARYAN BUILDCON L1 | PANKAJ TIWARI L4 | S S ENGINEERING WORKS LIMITED L3 |
|---|---|---|---|---|---|---|---|
| 1.01 | 1. Design and build of one nos of sewage treatment plant of installed capacity 2.00 MLD and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 1548 meters of main trunks having diameter 225mm to 400 mm RCC NP3 pipe length including construction of manholes, catch basins, survey, design and all appurtenant structures and allied works; and of treated waste water
3. Operation & maintenance of the complete works of sewage treatment plant, Intercepting sewer and/or interception & diversion works of Nallahs and pumping stations for a period of 05 years after completion of works, including defect liability period (DLP) of 1 year, starting from the date of commission of the project | 1 | Nos | 4,33,72,389 ₹4,33,72,389 | 4,19,51,385 ₹4,19,51,385 Lowest | 4,69,97,317 ₹4,69,97,317 | 4,39,87,860 ₹4,39,87,860 |
Tender Value
₹4.5 Cr
EMD Value
₹2.3 L
Closing Date
31 Jan 2025, 6:00 pmClosed
Chief Municipal Officer
Municipal Council Lateri
Interception And Diversion of Nallahs with STP works Project of Lateri town under SBM 2.0
2025_UAD_394884_1
64
Open Tender
Civil Works - Others
Lump-sum
540 days
LATERI
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹2.3 L
21 Aug 2025
13 Jan 2025
3 Feb 2025
13 Jan 2025
31 Jan 2025
16 Jan 2025
Amount
1. Design and build of one nos of sewage treatment plant of installed capacity 2.00 MLD and all appurtenant structures and allied works; 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 1548 meters of main trunks having diameter 225mm to 400 mm RCC NP3 pipe length including construction of manholes, catch basins, survey, design and all appurtenant structures and allied works; and of treated waste water 3. Operation & maintenance of the complete works of sewage treatment plant, Intercepting sewer and/or interception & diversion works of Nallahs and pumping stations for a period of 05 years after completion of works, including defect liability period (DLP) of 1 year, starting from the date of commission of the project
goutam gouri construction company (BID ID -1187824)
S S ENGINEERING WORKS LIMITED (BID ID -1188040)
PANKAJ TIWARI (BID ID -1187796)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .