Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹4,410
Closing Date
27 Aug 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
CONSTRUCTION OF CROSSING AT VASAKNAG NLO MOHD AKRAM KHANDAY AT WALTENGOO A KULGAM 381
2026_RDPR_321003_4
e- NIT No. 69 OF REWK/PRI/2026-27 Dated 14-08-2026
Open Tender
Civil Works
Percentage
40 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EX ENGINEER REW KULGAM
₹4,410
17 Sept 2026
14 Aug 2026
29 Aug 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed | 2.83 | cum | - | - |
| 2 | Providing and laying dry stone soling hand packed | 1.08 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering shuttering, - All work upto plinth level in 1:3:6 cement concrete with 20 mm N/S of aggregates (Crushed) excluding all carriages upto site of work. | 3.63 | cum | - | - |
| 4 | Reinforced cement concrete work in Slab excluding cost of centring, shuttering, finishing and reinforcement,with 1:1.5:3 graded stone aggregate 20mm nominal size | 5.13 | cum | - | - |
| 5 | Reinforcement for RCC work including straightening,bending,cutting,placing in position and binding all complete, hot rolled deformed bars.@ 85 kgs /cum | 436.31 | kgs | 1 | ₹435.87 |
| 6 | Centering and shuttering incl. strutting, propping etc and removal of form work using kit ply shuttering plates.abutment | 14.86 | sqm | - | - |
| 7 | Centering and shuttering incl. strutting, propping etc and removal of form work using kit ply shuttering plates.slab | 19.52 | sqm | - | - |
| 8 | Grill work at edges of the Crossing slab to be paid as per actual | 1 | job | - | - |
| 9 | carriage charges for sand / Stone aggregates lead up to 15 kms | 11.91 | cum | - | - |
| 10 | photograph /signboard charges(2.5X2.5)size | 1 | job | 0.8 | ₹0.8 |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_1069299.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .