Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.2 CrAccepted-AOC | ₹7.2 Cr | 1 | Accepted-AOC WORK ORDER |
| 2 | 2₹7.2 Cr+₹2.7 L (0.37%)Rejected-Finance A8 2 604 PERFECT 10 BALEWADI PUNE | PUNE | MAHARASHTRA | ₹7.2 Cr+₹2.7 L (0.37%) | 2 | Rejected-Finance Reject |
| 3 | 3₹7.4 Cr+₹17.9 L (2.49%)Rejected-Finance | ₹7.4 Cr+₹17.9 L (2.49%) | 3 | Rejected-Finance Reject |
| 4 | 4₹7.5 Cr+₹28.2 L (3.92%)Rejected-Finance | ₹7.5 Cr+₹28.2 L (3.92%) | 4 | Rejected-Finance Reject |
| 5 | Not Admitted-Fee/PreQual/Technical EAGLE CONSTRUCTION | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | UMESH N CHAUDHARI L2 | Sarvendra Infrastructure L4 | VINOD JANARDHAN BORATE L1 | Seva Enterprises L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | 1)Proposed Construction and five year Maintenance of Submerssible Bridge at CH 0/420 across River Chand on Mayani to Shedgewadi Road Tal. Khatav Dist. Satara Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. as directed by Engineer in Charge. | 0.72 | Hectare | 29,247.43 ₹21,204.39 | 30,280.94 ₹21,953.68 | 29,138.79 ₹21,125.62 Lowest | 29,863.08 ₹21,650.73 |
| 2.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Cement Concrete.as directed by Engineer in Charge. | 75 | Cubic Meter | 1,031.84 ₹77,388 | 1,068.3 ₹80,122.5 | 1,028.01 ₹77,100.75 Lowest | 1,053.56 ₹79,017 |
| 3.00 | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. Above 600 mm to 900 mm dia Hume pipe. as directed by Engineer in Charge. | 50.4 | Running Meter | 648.31 ₹32,674.82 | 671.22 ₹33,829.49 | 645.91 ₹32,553.86 Lowest | 661.96 ₹33,362.78 |
| 4.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting with vibratory roller to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5.For lead upto 250 m.as directed by Engineer in Charge. | 2,542.49 | Cubic Meter | 663.33 ₹16,86,509.89 | 686.77 ₹17,46,105.86 | 660.86 ₹16,80,229.94 Lowest | 677.29 ₹17,22,003.05 |
| 5.00 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting with vibratory roller to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.as directed by Engineer in Charge. | 327.6 | Cubic Meter | 771.05 ₹2,52,595.98 | 798.29 ₹2,61,519.8 | 768.18 ₹2,51,655.77 Lowest | 787.28 ₹2,57,912.93 |
| 6.00 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.For Grading II Material.as directed by Engineer in Charge. | 129.09 | Cubic Meter | 2,322.75 ₹2,99,843.8 | 2,404.82 ₹3,10,438.21 | 2,314.12 ₹2,98,729.75 Lowest | 2,371.64 ₹3,06,155.01 |
| 7.00 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by Engineer-in-charge , compacting with vibratory roller, finishing, curing and including preparation of subgrade surface if required etc. complete. as directed by Engineer in Charge. | 103.13 | Cubic Meter | 3,953.66 ₹4,07,740.96 | 4,093.37 ₹4,22,149.25 | 3,938.97 ₹4,06,225.98 Lowest | 4,036.88 ₹4,16,323.43 |
| 8.00 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel,edges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501(excluding dowel bars and Polythene sheet).as directed by Engineer in Charge. | 195 | Cubic Meter | 9,572.67 ₹18,66,670.65 | 9,910.94 ₹19,32,633.3 | 9,537.11 ₹18,59,736.45 Lowest | 9,774.17 ₹19,05,963.15 |
| 9.00 | Providing and laying cement concrete pipe of IS 458:2003 NP-3 class of 600mm diameter in proper line, level and slope etc. complete.as directed by Engineer in Charge. | 27.5 | Running Meter | 5,282.68 ₹1,45,273.7 | 5,469.35 ₹1,50,407.13 | 5,263.05 ₹1,44,733.88 Lowest | 5,393.88 ₹1,48,331.7 |
| 10.00 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil. Upto 3 m depth by mechanical means ( This item shall be used when total estimate quantity exceeds 100 cum) as directed by Engineer in Charge. | 735.88 | Cubic Meter | 738.87 ₹5,43,719.66 | 764.98 ₹5,62,933.48 | 736.12 ₹5,41,695.99 Lowest | 754.42 ₹5,55,162.59 |
Tender Value
₹6.9 Cr
EMD Value
₹3.4 L
Closing Date
22 Dec 2025, 5:30 pmClosed
Superintending Engineer (PMGSY) MRRDA, Pune Region
Superintending Engineer (PMGSY), Maharashtra Rural Road Development Association, Pune Region Pune, Block No. 306, 3rd Floor, New Administrative Building, Opp. Council Hall, Camp, Pune - 411 001
Package NO. ADB (II) SAT-BR-05 Tal. Khatav, Dist. Satara Total 05 Bridge Work
2025_MRRDA_1259755_4
E-Tender No.13/2025-26 Bridge 5 Package
Open Tender
Civil Works - Bridges
Item Rate
545 days
Satara
As per SBD and NIT
8 documents required · 8 mandatory
₹17,000
₹3.4 L
30 Jul 2026
15 Dec 2025
24 Dec 2025
15 Dec 2025
22 Dec 2025
15 Dec 2025
15 Dec 2025 - 17 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1)Proposed Construction and five year Maintenance of Submerssible Bridge at CH 0/420 across River Chand on Mayani to Shedgewadi Road Tal. Khatav Dist. Satara Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. as directed by Engineer in Charge. | - | Hectare | 1 | - |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Cement Concrete.as directed by Engineer in Charge. | - | Cubic Meter | 1 | - |
| 3 | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. Above 600 mm to 900 mm dia Hume pipe. as directed by Engineer in Charge. | 1 | Running Meter | - | - |
| 4 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting with vibratory roller to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5.For lead upto 250 m.as directed by Engineer in Charge. | 1 | Cubic Meter | 1 | ₹1 |
| 5 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting with vibratory roller to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.as directed by Engineer in Charge. | - | Cubic Meter | 1 | - |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.For Grading II Material.as directed by Engineer in Charge. | 129.09 | Cubic Meter | 1 | ₹128.96 |
| 7 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by Engineer-in-charge , compacting with vibratory roller, finishing, curing and including preparation of subgrade surface if required etc. complete. as directed by Engineer in Charge. | 1 | Cubic Meter | - | - |
| 8 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel,edges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501(excluding dowel bars and Polythene sheet).as directed by Engineer in Charge. | - | Cubic Meter | - | - |
| 9 | Providing and laying cement concrete pipe of IS 458:2003 NP-3 class of 600mm diameter in proper line, level and slope etc. complete.as directed by Engineer in Charge. | - | Running Meter | - | - |
| 10 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil. Upto 3 m depth by mechanical means ( This item shall be used when total estimate quantity exceeds 100 cum) as directed by Engineer in Charge. | 1 | Cubic Meter | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
SBDB2ADBIISATBR05.pdf
Tender Documents • 2.60 MB
BOQ_2171285.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .