| 3 | Admitted-Finance NO 2 13 1ST PHASE PEENYA INDUSTRIAL AREA PEENYA BANGALORE KARNATAKA 560058 | BENGALURU URBAN | KARNATAKA | 560058 | Admitted-Finance |
Tender Value
₹33.4 L
EMD Value
₹66,742
Closing Date
19 May 2022, 2:00 pmClosed
Project Director
Office of the Project Director, FRFCF-NRB, Kalpakkam.
Design, fabrication, supply, fitting of glove box panels, interconnecting tunnels and other accessories and glove box inter connection, Glove box train formation and leak testing at FRFCF site
2022_BARC_686452_1
BARC/NRB/FRFCF/FFP/TR/09/2022
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
365 days
FRFCF, Kalpakkam
Please Refer Tender Document
7 documents required · 7 mandatory
₹0
₹66,742
FRFCF, Kalpakkam
28 Jul 2022
2 May 2022
20 May 2022
2 May 2022
19 May 2022
3 May 2022
3 May 2022 - 18 May 2022
18 May 2022
Amount
Installation of Glove box SS Panel –A (Circular viewing window panel, refer Annexure F, Fig. 1) issued as FIM, without Panel Modification; The scope of work includes fixing of Gasket issued as FIM , fixing of panel on the glove box available at site, clamping, minor edge rounding, minor machining ,minor surface finish & levelling as described in Annexure-A
Installation of Glove box SS Panel –B (Circular viewing window panel, refer Annexure F, Fig. 2) issued as FIM, without Panel Modification; the scope of work includes fixing of Gasket issued as FIM , fixing of panel on the glove box available at site, clamping, minor edge rounding, minor machining ,minor surface finish &levelling as described in Annexure-A
Fabrication and installation of SS panels Panel -C (Side panel, refer Annexure F, Fig. 3) from Blind Panel issued as FIM; The scope of work includes, making circular cut out for glove port and tunnel, square cut out for filter box; fixing/welding, surface finish, levelling, fixing of Gasket issued as FIM, fixing of panel on the glove box available at site, clamping, minor edge rounding, minor machining ,minor surface finish & levelling, as described in Annexure-A
Fabrication and installation of SS panels Panel -D (Top panel with rectangular light cut out, refer Annexure F, Fig. 4) from Blind Panel issued as FIM; The scope of work includes, making rectangular cut out for the purpose of tube light fixtures ( tube light is not in the scope) ; fixing/welding, surface finish, levelling, fixing of Gasket issued as FIM, fixing of panel on the glove box available at site, clamping, minor edge rounding, minor machining ,minor surface finish & levelling, as described in Annexure-A
Fabrication and installation of SS panels Panel -E (Top panel with circular light cut out and square cut out for filter box, refer Annexure F, Fig. 5) from Blind Panel issued as FIM; The scope of work includes, making 3circular cut out for purpose of installation of LED light fixtures and 1 square cut out for installation of filter box; fixing/welding, surface finish, levelling, fixing of Gasket issued as FIM, fixing of panel on the glove box available at site, clamping, minor edge rounding, minor machining ,minor surface finish & levelling, as described in Annexure-A
Fabrication and installation of Panel -F (Glass Panel, refer Annexure F, Fig. 6); The scope of work includes, fabrication of glass panel including fabrication and fixing of 8 inch diameter SS glove ports; surface finish, levelling, fixing of Gasket issued as FIM, fixing of panel on the glove box available at site, clamping, minor edge rounding, minor machining ,minor surface finish & levelling, as described in Annexure-A
Supply, fabrication and installation of 8 inch diameter glove port on type C panels as described in Annexure A (refer Annexure F, Fig. 7)
Supply, fabrication and installation of 8 inch diameter glove port bungs with O Rings described in Annexure A (refer Annexure F, Fig. 10)
Supply, fabrication and installation of Transfer tunnel of 300mm length and 12 inch diameter as described in Annexure A (refer Annexure F, Fig. 9)
Supply, fabrication and installation of 300 mm diameter tunnel bungs with O Rings described in Annexure A (refer Annexure F, Fig. 10)
Supply, fabrication and installation of Bag /in Bag out port of 300mm length and 12 inch diameter as described in Annexure A (refer Annexure F, Fig. 9)
Supply, fabrication and installation of Transfer tunnel of 700mm length and 12 inch diameter as described in Annexure A (refer Annexure F, Fig. 9)
Supply, fabrication and installation of “C” channel type adapter panel of 3mm thickness and120mm width as described in Annexure A(refer Annexure E, Fig. 13)
Supply and fabrication of SS 304 1" dia and sch 40 of 6 meter pipes and SS 304 1" ball valves as per (refer Annexure F, Fig. 11) and installation as per layout in Annexure E Fig. 1 to Fig. 4; the work involves bending of pipe, welding of joints, providing knurled coupling fitting for connecting Rotameter issued as FIM, fixing of pipe on the support fixture, weld inspection, leak testing, fixing of ends on HEPA filter box provided on the glove box panel, fixing of dust cover on other end of pipe using the following items as described in Annexure A
Supply and fabrication of SS 304 1.5" dia and sch 40 of 6 meter pipes and SS 304 1.5" ball valves as per (refer Annexure F, Fig. 12) and installation as per layout in Annexure E Fig. 1 to Fig. 4; the work involves bending of pipe, welding of joints, fixing of pipe on the support fixture, weld inspection, leak testing, fixing of ends on HEPA filter box provided on the glove box panel, fixing of dust cover on other end of pipe using the following items as described in Annexure A
Interconnection for formation of glove box train including fixing of fabricated ( Ref Schedule 13) adapter flange panel as required, clamping, surface finish, leveling, as described in Annexure A(ref. Annexure E, Fig T1)
Interconnection for formation of glove box train including fixing of fabricated ( Ref Schedule 13) adapter panel flange or fabricated ( Ref Schedule 12) tunnel as required, clamping, surface finish, leveling, as described in Annexure A(ref. Annexure E, Fig T2)
Interconnection for formation of glove box train including fixing of fabricated ( Ref Schedule 12) tunnel as required, clamping, surface finish, leveling, as described in Annexure A(ref. Annexure E, Fig T3)
Interconnection for formation of glove box train including fixing of fabricated ( Ref Schedule 13) adapter flange panel as required, clamping, surface finish, leveling, as described in Annexure A(ref. Annexure E, Fig T4)
Leak test of individual glove boxes by placing bungs. Scope of work including, preparation of glove box isolation, conducting leak testing , identification of leak path/parts, implementing corrective measure like tightening, mechanical alignment as prescribed in Annexure A
Leak test of train( T1) glove boxes by placing bungs, Scope of work including, preparation of glove box isolation, conducting leak testing , identification of leak path/parts, implementing corrective measure like tightening, mechanical alignment as prescribed in Annexure A
Leak test of train (T2) glove boxes by placing bungs. Scope of work including, preparation of glove box isolation, conducting leak testing , identification of leak path/parts, implementing corrective measure like tightening, mechanical alignment as prescribed in Annexure A
Leak test of train (T3) glove boxes by placing bungs. Scope of work including, preparation of glove box isolation, conducting leak testing , identification of leak path/parts, implementing corrective measure like tightening, mechanical alignment as prescribed in Annexure A
Leak test of train (T4) glove boxes by placing bungs. Scope of work including, preparation of glove box isolation, conducting leak testing , identification of leak path/parts, implementing corrective measure like tightening, mechanical alignment as prescribed in Annexure A
Vacuum techniques PVt Ltd
Pooja Engineering Works
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .