| 1 | L1₹9.0 CrAccepted-AOC 24 JEEVAN PLAZA VIRAM KHAND 5 GOMTI NAGAR LUCKNOW UTTAR PRADESH | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹9.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹9.5 Cr+₹48.5 L (5.37%)Rejected-AOC | ₹9.5 Cr+₹48.5 L (5.37%) | L2 | Rejected-AOC L2 |
Tender Value
₹9.5 Cr
EMD Value
₹19.1 L
Closing Date
4 Oct 2024, 11:00 amClosed
Superintending Engineer
Office Superintending Engineer 14th Circle Irrigation Work Azamgarh
Work of demarcation and restoration of Phulpur Dy.
2024_UPIDC_960154_4
06/SE/2024-25
Open Tender
Civil Works
Item Rate
180 days
SULTANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,614
₹19.1 L
Yes
AZAMGARH
30 Nov 2024
28 Sept 2024
4 Oct 2024
28 Sept 2024
4 Oct 2024
28 Sept 2024
30 Sept 2024
Amount
Earth work in excavation including lead up to 30 meter lift upto 1.50 meter excluding mechanical compaction but including manual compaction & dressing to profile.
E/W in foundation including lead up to 30m and lift up to 1.50m and its disposal and back filling including all cost of labour and T&p.
Laying of PCC in 1:3:6 (M-10) with stone ballast 20mm to 40mm size and coarse sand FM not less than 2.00 including all cost of labour and T&P.
Laying of PCC in 1:2:4 complet in all respect i.e. shuttering per cubic meter
First class brick work 1:4 CM of wall including cost of all material ,labour,T&P.
Struck deep cement pointing in 1:2 CM with coarse sand including cost of al material labour T&P etc.
Centering & Shuttering work for P.C.C.(foundation)
Centering & Shuttering for R.C.C. work.(super structure)
Providing & Laying C.C (1:1.5:3) M-20 complete in all respect i.e.
Providing & Laying R.C.C (1:1.5:3) M-20 complete in all respect i.e.
R.C.C. NP3 Hume Pipe dia 150 mm as per market
Repairing work of head regulators steel gate
Finishing of walls with water proof cement paint.
Writing letter on sign board above 50 mm size but below 80 mm size
Brick on edge soling per square meter.
Providing and laying, cutting & binding of Steel Reinforcement.
Providind & Laying LDPE film including all cost of material.
Painting two coat of synthentic enamel panit
Suply and making Sign board during construction
Filling 100 mm thick coarse sand complete in all respect.
Cost of crushed aggregate 4.75mm to 20 mm including cost of all material ,labour,T&P.
10 to 12 mm thick Cement Plaster in 1:2 including cost of all material,labour T&P
Face to be painted with bitmen
Providing and fixing Wheelgaurd including all material T&P with all respect .
Supply anud fixing sealing material including all labour & T&P.
Suplly and Fixing solar light including all labour T&P
M/S SANGHARSH CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .