Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC BANAMALIPRASAD R M TO ROAD DHENKANAL | ₹3.0 L | L1 | Accepted-AOC Work Order |
| 2 | L2₹3.4 L+₹38,529.65 (13.0%)Rejected-Finance AT SIJUKALA P O TIKHIA DIST MAYURBHANJ | MAYURBHANJ | ODISHA | ₹3.4 L+₹38,529.65 (13.0%) | L2 | Rejected-Finance L2 |
Tender Value
₹3.0 L
EMD Value
₹2,966
Closing Date
25 Feb 2026, 5:00 pmClosed
Executive Officer, soro Municipality
Executive Officer, soro Municipality
Construction Work
2026_ORULB_125887_41
SOROM_07_2025-26
Open Tender
Civil Works - Others
Percentage
90 days
Soro Municipality, Soro
Please refer to the tender document
2 documents required · 2 mandatory
₹2,000
₹2,966
Yes
8 Sept 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
25 Feb 2026
18 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Single under reamed 250 mm dia pile foundation with RCC M20 using 12mm size HGCB Stone chips incluiding cost of boring but excluding cost of MS/Tor steel and labour charges for cutting, bening and binding of steel. | 5 | Nos | 2,646.2 | ₹13,231 |
| 2 | Earth work in hard soil or gravelly soil within 50mtr. initial lead and 1.50mtr initial lift including rough dressing and levelling the bed | 13.44 | Cum | 296.72 | ₹3,988.81 |
| 3 | Filling in foundation and plinth with sand well watered , rammed etc including all cost conveyance roalty ,labour and T&P etc. complete as directed by the Engineer - in Charge. | 12.18 | Cum | 1,679.19 | ₹20,452.53 |
| 4 | Cement concrete (1:3:6) using 4cm size hard granite (H.B) metal with all cost conveyance,royalty,taxes etc all complete. | 14.58 | Cum | 6,461.94 | ₹94,234.47 |
| 5 | C.C(1:2:4) with12 mm grade HGCB Stone chips incluiding cost, conveyance, royality,curing etc. complete . | 1.5 | Cum | 7,994.24 | ₹11,991.36 |
| 6.1 | R.C.C Work M20 using 20 mm & down grade HGCB Stone chips incluiding hoisting, laying,curing etc. complete but excluiding cost of steel reinforcement. A) Pile cap | 0.7 | Cum | 7,358.79 | ₹5,151.15 |
| 6.2 | B)PlinthBeam | 0.5 | Cum | 7,713.99 | ₹3,857 |
| 6.3 | C)Column/Beam | 0.56 | Cum | 14,189.3 | ₹7,946.01 |
| 7 | Supplying , fitting , fixing & placing uncoatingHYSD bar reinforcement complete as per drawing & technical specification complete. | 2.41 | Qntl | 8,664.74 | ₹20,899.35 |
| 8 | Brick work with Flyash Bricks having crushing strength between 100kg/cm2 to 149kg/cm2 in Cement mortar(1:6) in super structure | 3.4 | Cum | 4,525.02 | ₹15,385.07 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.37 MB
BOQ_581175.xls
BOQ • 0.24 MB
Corrigendum.pdf
PDF • 1.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .