Loading…
Loading…
Tender Value
₹9.0 L
EMD Value
₹18,000
Closing Date
8 Jul 2026, 12:00 pmDue today
Er Narendra Chaudhary
Vikas bhawan
Janpad Unnao ke PM Shri Rajikiya Balika Intercollage Unnao me Ann Bhandar Grah Bhawan Ka Nirman karye.
2026_REDUP_1165966_1
830/red/tender/Unnao/26-27 dt-10-06-2026
Open Tender
Civil Works
90 days
Unnao
Plz Refer Doc
2 documents required · 2 mandatory
₹2,384
₹18,000
Yes
2 Jul 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil(loam clay or sand) including lift upto 1.5m and lead upto 30m.and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of earth.asSS.I. 251 | 22.13 | cum | - | - |
| 2 | Providing and laying in cement concrete 1:6:12(1cement : 6 fine sand :12, 40 mm brick aggregrate ) .As per S.I.No. 273 | 9.67 | cum | - | - |
| 3 | M -150 class Brick work in 1:6 cement & fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials,Labour and T&P etc. required for proper completion of work. S.I. 303 | 11.8 | cum | - | - |
| 4 | M -150 class Brick work in 1:4 cement & fine sand of 1.25 F.M. mortar in super structure including supply of all materials,Labour and T&P etc. required for proper completion of work. S.I. 310 | 28.25 | cum | - | - |
| 5 | R.C.C. work with cement approved coarse sand and 2cm,gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also supply of all materials, labour and T&Prequired for proper completion of work.asS.I. 283 | 10.29 | cum | - | - |
| 6 | R.C.C. work with cement approved coarse sand and 2cm,gauge approved stone ballast in the proportion of 1:2:4 in Slab excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also supply of all materials, labour and T&Prequired for proper completion of work.asS.I. 284 | 9.7 | cum | - | - |
| 7 | Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (when not included in over all retes) wrought to required shape as necessary including binding for proper completion of the work and including supply of all steel and wastage & over lapping &hooks. as S.I. 504 | 15.87 | qtl | - | - |
| 8 | 12mm thick plaster with cement mortar in proportion of 1:6 with cement and fine sand of 1.25 F.M. as S.I. 586 | 207.26 | sqm | - | - |
| 9 | 15mm Cement plaster in 1:6 with rough side of singl or half brick wallcement c/sand mortar in all labour and T&P complete. | 130.91 | sqm | 1 | ₹130.78 |
| 10 | 25 mm thick 1:3 cement :c.sand plaster on roof | 169.8 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
SBD.pdf
Tender Documents • 0.95 MB
BOQ_2186793.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid