Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.2 LAdmitted-Fee/PreQual/Technical/Finance MGR SALAI 2ND CROSS STREET MGR SALAI 5TH CROSS STREET MGR SALAI 33 UNIT 41 ZONE 14 | -24.10% | ₹18.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹18.9 L+₹62,468.36 (3.43%)Admitted-Fee/PreQual/Technical/Finance TAMIL NADU TAMIL NADU TAMIL NADU | COIMBATORE | TAMIL NADU | 638459 | -21.50% | ₹18.9 L+₹62,468.36 (3.43%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹19.5 L+₹1.3 L (6.86%)Admitted-Fee/PreQual/Technical/Finance NA | NA | NA | 121004 | -18.89% | ₹19.5 L+₹1.3 L (6.86%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹20.4 L+₹2.2 L (12.0%)Admitted-Fee/PreQual/Technical/Finance CHENNAI | CHENNAI | CHENNAI | TAMIL NADU | -14.99% | ₹20.4 L+₹2.2 L (12.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹22.8 L+₹4.6 L (25.2%)Admitted-Fee/PreQual/Technical/Finance NO 1 853 NEELANGARI LINK ROAD PRABHU NAGAR THORAIPAKKAM CHENNAI 600 097 | CHENNAI | CHENNAI | TAMIL NADU | 600097 | -4.99% | ₹22.8 L+₹4.6 L (25.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.0 L
EMD Value
₹24,100
Closing Date
2 Jul 2026, 3:00 pmClosed
COMMISSIONER GREATER CHENNAI CORPORATION
No_ 6_64_ Puzhuthivakkam Main road Puzhuthivakkam Chennai 600 091
Z.O.XIV.C.No.E2/3669/2026 IMPROVEMENTS AND MINOR REPAIR WORK OF SIDE DRAIN AT ANNA SALAI AND THIRUVALLUVAR NAGAR SELVA VINAYAGAR KOIL STREET IN DIVISION-191, UNIT-43, ZONE-14
2026_CoC_682865_1
Z.O.XIV.C.No.E2/3669/2026
Open Tender
Civil Works
Works
60 days
GREATER_CHENNAI_CORPORATION_ZONE-14
REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹24,100
3 Jul 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
2 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of RCC Slab (reinforcement is being co...torm Water Drain - Steel is declared unfit for use | 23 | CUM | 2,220.9 | ₹51,080.7 |
| 2 | Supplying and erecting centering for plane surface...g shall be given after the concrete is laid).BEAM | 233 | SQM | 1,267.76 | ₹2,95,388.08 |
| 3 | Providing And Laying. In Position, Standardised Co...The Department For The Excess Usage of Materials). | 34.5 | CUM | 9,539.34 | ₹3,29,107.23 |
| 4 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level | 3,105 | KGS | 98.7 | ₹3,06,463.5 |
| 5 | Supplying and fixing of 24” SFRC Gully Gratings of...ll be painted with anti corrosive bitumastic paint | 106 | EACH | 6,305.4 | ₹6,68,372.4 |
| 6 | Construction of cast -in- situ Silt Catch Pit of i... the finishing work etc., cost per each number. | 34 | EACH | 14,770.45 | ₹5,02,195.3 |
| 7 | Brick work in following Cement Mortar using best q...Executive Engineer in charge. In Cement Morter 1:5 | 20.7 | CUM | 7,935.89 | ₹1,64,272.92 |
| 8 | Plastering the surface of walls with Cement Mortar...d as directed by the departmental officers. (Wall) | 270 | SQM | 317.59 | ₹85,749.3 |
stage.html
html • 0.02 MB
finance_820903.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
3669.pdf
Tender Documents • 0.55 MB
BOQ_820903.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .