Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | ₹5.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.9 LRejected-Finance | ₹5.9 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | BASERA DEVELOPERS L2 | MOHD IMRAN CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Cutting in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and lead 30 m. the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 m distances as directed by Engineer-in-Charge. | 35.69 | cum | 48 ₹1,712.88 | 36.02 ₹1,285.37 |
| 2.00 | Earth work in embankment in ordinary soil in 20 cm layer including ramming and dressing the surface to the required level and slope also including Carriage beyond 3.0 KM up to work site with all lead and lift, royalty and all taxes complete as per directed by Engineer -in-Charge. | 2,515.82 | cum | 234 ₹5.9 L | 231.02 ₹5.8 L |
Tender Value
₹7.6 L
EMD Value
₹15,000
Closing Date
16 Feb 2026, 2:00 pmClosed
Executive Engineer
M.G.C.C.D.-7 Bijnor
construction of canal from km. 2.085 to km. 2.140 km. 3.000 to km. 3.100 and km. 5.580 to km. 5.660 of Babaina Mr. (Lot- 14)
2026_UPIDC_1113144_3
03/EE/2025-26
Open Tender
Civil Works - Canal
sambhal
Please refer Tender documents.
3 documents required · 3 mandatory
₹854
₹15,000
15 May 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
Earth work in Cutting in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and lead 30 m. the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 m distances as directed by Engineer-in-Charge.
Earth work in embankment in ordinary soil in 20 cm layer including ramming and dressing the surface to the required level and slope also including Carriage beyond 3.0 KM up to work site with all lead and lift, royalty and all taxes complete as per directed by Engineer -in-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Tendernotice_2.pdf
PDF • 1.00 MB
lot14.pdf
Tender Documents • 0.99 MB
BOQ_2059943.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid