Loading…
Loading…
Tender Value
₹26.3 L
EMD Value
₹2.6 L
Closing Date
28 Sept 2026, 5:00 pmDue tomorrow
E.E.M.I.DIV.SAMBHAL
E.E.M.I.DIV.SAMBHAL BLOCK BANIAKHEDA CAMPUS, CHANDAUSI, SAMBHAL
REJUVENATION OF POND VILLAGE FARRAKHPUR, BLOCK SAMBHAL, DISTT SAMBHAL
2026_UPMID_1187258_1
05/EE/26-27
Open Tender
Civil Works - Others
Percentage
90 days
OND VILLAGE FARRAKHPUR, BLOCK SAMBHAL
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹854
EXECUTIVE ENGINEER, M.I.DIV.SAMBHAL
₹2.6 L
18 Sept 2026
18 Sept 2026
29 Sept 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Layout, Dagbelling and Shifting of Bench Mark | 20 | Mandays | 420 | ₹8,400 |
| 1.02 | Earth work in Cutting in Embankment in Ordinary Soil With afflux bund, guide bund above 1.50 M Height etc including lead up to 30 M and lift up to 1.50 M | 8,733.7 | CuM | 69 | ₹6,02,625.3 |
| 1.03 | Extra Work for Slush Removal and lahel for earth work. | 4,366.85 | CuM | 48 | ₹2,09,608.8 |
| 1.04 | Same as Item No. 1.02 but including for Extra for Lift above 1.50 Meter for including upto 5 lift with every 0.30 Meter lift or part thereof. | 10,051.62 | CuM | 76.5 | ₹7,68,948.93 |
| 1.05 | Earthwork in excavation in foundation in ordinary soil including lift up 1.5 M and lead upto 30 M etc | 231.74 | CuM | 132 | ₹30,589.68 |
| 2 | Cement Concrete in 1:3:6 (1 Cement: 3Coarse Sand : 6 Stone Ballast 40mm) Complete with all material, labour & T&P. | 35.91 | CuM | 5,990.85 | ₹2,15,131.42 |
| 3 | Cement Concrete 1:2:4 with Cement, Coarse Sand and 20 MM Stone Grit Complete with all material, labour & T&P. | 15.29 | CuM | 6,430.68 | ₹98,325.1 |
| 4 | M-105 Brickwork in 1:4 Cement & Coarse Sand Mortar Complete with all material, labour & T&P. | 87.46 | CuM | 5,290.38 | ₹4,62,696.63 |
| 5 | 12 MM Plastering in 1:4 Cement, and Course sand Mortar Over Brick Masonry Complete with all material, labour & T&P. | 213.94 | SqM | 137.13 | ₹29,337.59 |
| 6 | S & F RCC Hume Pipe NP-3 Type 900 MM withComplete with all material, labour & T&P. | 30 | M | 5,554.5 | ₹1,66,635 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Tendernotice_2.pdf
PDF • 2.39 MB
BOQ_2235360.xls
BOQ • 0.30 MB
CORRIENGDUM05.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .