| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-Finance | ₹4.7 L | L1 | Accepted-Finance L1 BIDDER and the quoted price is an lower end compare the L2 bidder. So the committee recommended to accept the bidder. |
| 2 | L2₹4.9 L+₹21,331.83 (4.59%)Rejected-Finance | ₹4.9 L+₹21,331.83 (4.59%) | L2 | Rejected-Finance L2 BIDDER and the quoted price is an higher end. so the committee recommended to reject the bidder. |
| Sl No | Description | Qty | Unit | K SARASVATHI L1 | Ve Be N Construction L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling RCC bed/floor/road/slabs etc., complete and the debris remove from site as directed by the Federation officers and as per standard specification. | 8 | 1 m3 [One cubic meter] | 5,200 ₹41,600 Lowest | 5,250 ₹42,000 |
| 2.00 | Dismantling PCC road/floor/slabs etc., complete and the debris remove from site as directed by the Federation officers and as per standard specification. | 1.8 | 1 m3 [One cubic meter] | 600 ₹1,080 Lowest | 650 ₹1,170 |
| 3.00 | Dismantling brick wall work etc., complete and the debris remove from site as directed by the Federation officers and as per standard specification. | 7 | 1 m3 [One cubic meter] | 320 ₹2,240 Lowest | 340 ₹2,380 |
| 4.00 | Cleaning and levelling the existing surface using JCB machine etc., complete as directed by the Federation officers and as per standard specification. | 5 | 1 Day [One Day] | 7,400 ₹37,000 Lowest | 7,425 ₹37,125 |
| 5.00 | Re-route and dewatering the sewage water using adequate motor pump hire basis for dairy operational needs wherever necessary within the workin places shown by the Federation officers and as per standard specification. | 192 | 1 Hour [One Hour] | 300 ₹57,600 Lowest | 320 ₹61,440 |
| 6.00 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 33.3 | 1 m3 [One cubic meter] | 275 ₹9,157.5 | 270 ₹8,991 Lowest |
| 7.00 | Supplying and filling with M-Sand for basement to required thickness, watered, well rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 0.9 | 1 m3 [One cubic meter] | 2,200 ₹1,980 Lowest | 2,250 ₹2,025 |
| 8.00 | Supplying and filling with excavated earth for basement to required thickness, watered, well rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 34 | 1 m3 [One cubic meter] | 75 ₹2,550 Lowest | 80 ₹2,720 |
| 9.00 | Reinforced Cement Concrete 1:2:4 using 20 mm gauge hard broken stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating charges, finishing and curing, etc., complete complying with standard specification and as directed by the departmental officers. | 4.7 | 1 m3 [One cubic meter] | 9,000 ₹42,300 Lowest | 9,200 ₹43,240 |
| 10.00 | Supply, fabrication and placing in position of RTS grills etc., complete as directed by the federation officers and as per standard specifications. | 290 | 1 Kg [One kilo gram] | 110 ₹31,900 Lowest | 120 ₹34,800 |
Tender Value
₹4.2 L
Closing Date
18 Sept 2026, 11:30 amClosed
The Deputy General Manager Production
SIDCO INDUSTRIAL ESTATE, AMBATTUR, KORATTUR
Clarifier tank RCC floor and pipeline special repairs at Effluent Treatment Plant and Dairy Audit maintenance civil repairs at Ambattur Dairy
2026_TCMPF_703973_1
85/Civil/AD/Amb/2026
Limited
Civil Works
Lump-sum
Ambattur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
19 Sept 2026
11 Sept 2026
18 Sept 2026
11 Sept 2026
18 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling RCC bed/floor/road/slabs etc., complete and the debris remove from site as directed by the Federation officers and as per standard specification. | 8 | 1 m3 [One cubic meter] | 333.26 | ₹2,666.08 |
| 2 | Dismantling PCC road/floor/slabs etc., complete and the debris remove from site as directed by the Federation officers and as per standard specification. | 1.8 | 1 m3 [One cubic meter] | 125.7 | ₹226.26 |
| 3 | Dismantling brick wall work etc., complete and the debris remove from site as directed by the Federation officers and as per standard specification. | 7 | 1 m3 [One cubic meter] | 7,466.1 | ₹52,262.7 |
| 4 | Cleaning and levelling the existing surface using JCB machine etc., complete as directed by the Federation officers and as per standard specification. | 5 | 1 Day [One Day] | 125.7 | ₹628.5 |
| 5 | Re-route and dewatering the sewage water using adequate motor pump hire basis for dairy operational needs wherever necessary within the workin places shown by the Federation officers and as per standard specification. | 192 | 1 Hour [One Hour] | 7,466.1 | ₹14,33,491.2 |
| 6 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 33.3 | 1 m3 [One cubic meter] | 125.7 | ₹4,185.81 |
| 7 | Supplying and filling with M-Sand for basement to required thickness, watered, well rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 0.9 | 1 m3 [One cubic meter] | 7,466.1 | ₹6,719.49 |
| 8 | Supplying and filling with excavated earth for basement to required thickness, watered, well rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 34 | 1 m3 [One cubic meter] | 125.7 | ₹4,273.8 |
| 9 | Reinforced Cement Concrete 1:2:4 using 20 mm gauge hard broken stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating charges, finishing and curing, etc., complete complying with standard specification and as directed by the departmental officers. | 4.7 | 1 m3 [One cubic meter] | 7,466.1 | ₹35,090.67 |
| 10 | Supply, fabrication and placing in position of RTS grills etc., complete as directed by the federation officers and as per standard specifications. | 290 | 1 Kg [One kilo gram] | 125.7 | ₹36,453 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
85TDDocument.pdf
Tender Documents • 0.46 MB
BOQ_846128.xls
BOQ • 0.30 MB
ELIGIBILITYCRETERIA.pdf
Additional Documents • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .