| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | ₹5.0 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹5.0 LSame as L1Rejected-AOC | ₹5.0 LSame as L1 | L2 | Rejected-AOC Rejected |
| 3 | L2₹5.0 LSame as L1Rejected-AOC | ₹5.0 LSame as L1 | L2 | Rejected-AOC Rejected |
| 4 | L2₹5.0 LSame as L1Rejected-AOC AT PO BRAHMAPURA P S BANKI DIST CUTTACK PIN NO 754008 | CUTTACK | ODISHA | 754008 | ₹5.0 LSame as L1 | L2 | Rejected-AOC Rejected |
| 5 | L2₹5.0 LSame as L1Rejected-AOC | ₹5.0 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹5.0 L
EMD Value
₹5,000
Closing Date
4 Jun 2026, 5:00 pmClosed
Executive Engineer, CD-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Providing and fixing of drain slab at Various locations in Ward No.49.
2026_ORULB_128795_5
MC(CMC)CTC_Div-IIINo8/2026-27
Open Tender
Civil Works - Others
Percentage
30 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹5,000
Yes
26 Aug 2026
25 May 2026
8 Jun 2026
25 May 2026
4 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying all labour,materials,T&P for Cement Concrete M-20 for reinforced cement concrete works in using 12mm to 20 mm size hard granite Crusher Broken chips including cost of materials,royalty & conveyance charges with watering,curing all complete as per direction of Engineer-in-charge. | 29.76 | 1 Cum | 6,552.1 | ₹1,94,995.41 |
| 2 | Rigidsmooth centering and shuttering for RCC Work etc. | 165.3 | 1 Sqm | 248.7 | ₹41,110.11 |
| 3 | Straightening, cutting, bending and binding, welding and jointing (if necessary ) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). | 26.78 | Qntl | 9,395.3 | ₹2,51,650.06 |
| 4 | Provision for fixing of Pre-cast RCC slab | 8 | Nos | 462 | ₹3,696 |
| 5 | Transportaion of Precast RCC slab from casting site to work site | 30 | Cum | 278.77 | ₹8,363.1 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_592622.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_592622.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .