Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | L1 | Accepted-AOC L1 IS ACCEPTED | |
| 2 | L2₹10.2 L+₹12,047 (1.20%)Rejected-Finance 39 19 NAINI STREET ATHUR SALEM 636 102 | SALEM | TAMIL NADU | 636102 | L2 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | Blue Tech Infra Structure Private Ltd L1 | V S ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged Plain cement concrete surface Up to 3M height including clearing away from the site and all labour charges etc complete . | 40 | M3 | 546 ₹21,840 Lowest | 550 ₹22,000 |
| 2.00 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 125 | M3 | 173 ₹21,625 Lowest | 185 ₹23,125 |
| 3.00 | Cement concrete 1:4:8 mix (One cement four M.sand and Eight metal) using 40mm ISS hard broken granite stone jelly for foundation and flooring including dewatering wherever necessary and laid in layers of not exceeding 15cm thick to required thickness including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 20 | M3 | 5,653 ₹1,13,060 Lowest | 5,675 ₹1,13,500 |
| 4.00 | centering for sides and soffits of R.C.C.works such as lintels, slab that beams plain surface etc., complete excluding strutting upto 3.30 M height using mild steel sheet of size 90 c.m x 60 c.m and 10 gauge stifer with M.S. angles of size 25 mm x 25 mm x 3mm laid over silver w.c.wood joints of size 10 c.m. x 6 c.m. spaced at about 90 c.m. c/c and supported by casurins props of 10 c.m. to 13 c.m. dia spaced 75 c.m. centre to centre complying with as per standard specification | 590 | M2 | 511 ₹3,01,490 Lowest | 525 ₹3,09,750 |
| 5.00 | Plain cement concrete 1:2:4 mix (One cement two M.sand and four aggregate) using 20mm ISS metal including mixing, laying, consolidating, curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 10m3 | 77 | M3 | 6,944 ₹5,34,688 Lowest | 6,955 ₹5,35,535 |
| 6.00 | conveyance of excavated excess earth including loading unloading and refilling as directed by the departmental officers etc.,complete-1m3 3KM | 140 | M3 | 103 ₹14,420 Lowest | 109 ₹15,260 |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
18 Nov 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE COMMISSIONER, ERODE CITY MUNICIPAL CORPORATION
246, MEENAKSHI SUNDARNAR SALAI ERODE 638001
CONSTRUCTION OF STORM WATER DRAIN-WARD NO-32 (PACKAGE-10) (UNICODE NO.056032R3491)
2025_MAWS_624071_1
E1-2457-2025-3-ERODE CITY MUNICIPAL CORPORATION
Open Tender
Civil Works
Works
90 days
ERODE CITY MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹12,000
26 Oct 2026
17 Nov 2025
18 Nov 2025
17 Nov 2025
18 Nov 2025
17 Nov 2025
Amount
Dismantling the existing damaged Plain cement concrete surface Up to 3M height including clearing away from the site and all labour charges etc complete .
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Cement concrete 1:4:8 mix (One cement four M.sand and Eight metal) using 40mm ISS hard broken granite stone jelly for foundation and flooring including dewatering wherever necessary and laid in layers of not exceeding 15cm thick to required thickness including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
centering for sides and soffits of R.C.C.works such as lintels, slab that beams plain surface etc., complete excluding strutting upto 3.30 M height using mild steel sheet of size 90 c.m x 60 c.m and 10 gauge stifer with M.S. angles of size 25 mm x 25 mm x 3mm laid over silver w.c.wood joints of size 10 c.m. x 6 c.m. spaced at about 90 c.m. c/c and supported by casurins props of 10 c.m. to 13 c.m. dia spaced 75 c.m. centre to centre complying with as per standard specification
Plain cement concrete 1:2:4 mix (One cement two M.sand and four aggregate) using 20mm ISS metal including mixing, laying, consolidating, curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 10m3
conveyance of excavated excess earth including loading unloading and refilling as directed by the departmental officers etc.,complete-1m3 3KM
V S ASSOCIATES (BID ID -1530177)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_746226.xls
BOQ • 0.24 MB
CONDITIONS_3.pdf
Tender Documents • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .