Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-Finance | ₹29.8 L | L1 | Accepted-Finance Lowest and reasonable bid |
| 2 | L2₹31.7 L+₹1.9 L (6.38%)Rejected-Finance | ₹31.7 L+₹1.9 L (6.38%) | L2 | Rejected-Finance Other than the lowest bid |
| 3 | L3₹37.0 L+₹7.2 L (24.1%)Rejected-Finance | ₹37.0 L+₹7.2 L (24.1%) | L3 | Rejected-Finance Other than the lowest bid |
| Sl No | Description | Qty | Unit | M/S Vinod Kumar L1 | MS GURTEJ SINGH CONTRACTOR L2 | Balraj Singh Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00 | M & L for uprooting of trees, grass, bushes etc from brick wall/roof surface/or any other surfaces of building incl dismantling the req brick work/roof tiles/mud concrete etc for uprooting the vegetation etc and make good the same to match with existing surface with same material or concrete (1:2:4) type B-1 after pouring the chemical (which destroy the growth of vegetation to the place where vegetation removed). The rate shall include for scaffolding or any other arrangement required during this process upto 10 mtr height complete all as specified and directed. | 15,000 | Sqm | 60 ₹9,00,000 | 28 ₹4,20,000 Lowest | 80 ₹12,00,000 |
| 2.00 | Demolition of brick work built in cement mortar including all quoins, arches, pillar etc, but excluding ashlar facings complete all as specified and directed. | 50 | Cum | 100 ₹5,000 | 180 ₹9,000 | 50 ₹2,500 Lowest |
| 3.00 | Material and labour for brick work with sub class ‘B’ bricks straight or curved on plan exceeding 6m mean radius with old size bricks built in cement mortar 1:6 complete all as specified and directed. | 40 | Cum | 5,000 ₹2,00,000 | 4,800 ₹1,92,000 | 4,500 ₹1,80,000 Lowest |
| 4.00 | M&L brickwork with subclass `B' bricks straight or curved on plan exc 6 m mean radius built in CM 1:6 but except bricks complete all as specified and directed. | 10 | Cum | 2,500 ₹25,000 | 4,800 ₹48,000 | 1,500 ₹15,000 Lowest |
| 5.00 | M&L 40mm thick brick tiles laid in cement mortar bed 1:6 , 15 mm thick and joints grouted flush in cement mortar 1:3 mixed with 5% crude oil by weight of cement complete all as specified and directed. | 2,390 | Sqm | 400 ₹9,56,000 Lowest | 490 ₹11,71,100 | 500 ₹11,95,000 |
| 6.00 | All as per ser item No 5.00 above but except tiles complete all as specified and directed. | 500 | Sqm | 250 ₹1,25,000 Lowest | 270 ₹1,35,000 | 376 ₹1,88,000 |
| 7.00 | M&L Flush pointing in cement mortar 1:3 on brick tiles laid flat complete all as specified and directed. | 950 | X Sqm | 180 ₹1,71,000 Lowest | 580 ₹5,51,000 | 411 ₹3,90,450 |
| 8.00 | Demolition of cement concrete above ground floor and paving exc 15 cm thick (below or above ground level complete all as specified and directed. | 10 | Cum | 300 ₹3,000 | 200 ₹2,000 | 150 ₹1,500 Lowest |
| 9.00 | M&L for PCC 1:2:4 type B-1(using 20mm graded stone aggregates) in roof kerbs or mud stops benching rounded or chamfered on edges complete all as specified and directed. | 10 | Cum | 6,500 ₹65,000 | 3,500 ₹35,000 Lowest | 5,400 ₹54,000 |
| 10.00 | Taking down cement plastering on stone wall/brick wall etc including racking out of joints hacking for key scrubbing down with water etc complete all as specified and directed. | 1,000 | Sqm | 15 ₹15,000 | 10 ₹10,000 Lowest | 14 ₹14,000 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
31 Aug 2026, 6:00 pmClosed
GE (WEST) JRC
KABIR ROAD JALANDHAR CANTT
COMPREHENSIVE REPAIR TO ROOF, REMOVAL OF GRASS, BUSHES, CLEANING OF WATER TANK, REPAIR TO PARAPET HAUNCHING/ BUNCHING ETC UNDER GE (WEST) JRC
2026_MES_782772_1
GE/JAL(W)-29/2026-27
Open Tender
Civil Works
Item Rate
335 days
JALANDHAR CANTT
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (WEST)
₹70,000
Yes
8 Sept 2026
5 Aug 2026
7 Sept 2026
5 Aug 2026
31 Aug 2026
19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M & L for uprooting of trees, grass, bushes etc from brick wall/roof surface/or any other surfaces of building incl dismantling the req brick work/roof tiles/mud concrete etc for uprooting the vegetation etc and make good the same to match with existing surface with same material or concrete (1:2:4) type B-1 after pouring the chemical (which destroy the growth of vegetation to the place where vegetation removed). The rate shall include for scaffolding or any other arrangement required during this process upto 10 mtr height complete all as specified and directed. | 15,000 | Sqm | - | - |
| 2 | Demolition of brick work built in cement mortar including all quoins, arches, pillar etc, but excluding ashlar facings complete all as specified and directed. | 50 | Cum | - | - |
| 3 | Material and labour for brick work with sub class ‘B’ bricks straight or curved on plan exceeding 6m mean radius with old size bricks built in cement mortar 1:6 complete all as specified and directed. | 40 | Cum | - | - |
| 4 | M&L brickwork with subclass `B' bricks straight or curved on plan exc 6 m mean radius built in CM 1:6 but except bricks complete all as specified and directed. | 10 | Cum | - | - |
| 5 | M&L 40mm thick brick tiles laid in cement mortar bed 1:6 , 15 mm thick and joints grouted flush in cement mortar 1:3 mixed with 5% crude oil by weight of cement complete all as specified and directed. | 2,390 | Sqm | - | - |
| 6 | All as per ser item No 5.00 above but except tiles complete all as specified and directed. | 500 | Sqm | - | - |
| 7 | M&L Flush pointing in cement mortar 1:3 on brick tiles laid flat complete all as specified and directed. | 950 | X Sqm | - | - |
| 8 | Demolition of cement concrete above ground floor and paving exc 15 cm thick (below or above ground level complete all as specified and directed. | 10 | Cum | - | - |
| 9 | M&L for PCC 1:2:4 type B-1(using 20mm graded stone aggregates) in roof kerbs or mud stops benching rounded or chamfered on edges complete all as specified and directed. | 10 | Cum | - | - |
| 10 | Taking down cement plastering on stone wall/brick wall etc including racking out of joints hacking for key scrubbing down with water etc complete all as specified and directed. | 1,000 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
TenderDocuments29.pdf
Tender Documents • 1.08 MB
BOQ_876989.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .