| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹1.7 L+₹3,299.28 (2.00%)Rejected-Finance | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹1.7 L+₹7,505.86 (4.55%)Rejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹1.7 L
EMD Value
₹2,100
Closing Date
7 Mar 2024, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Routing cleaning, dry lnspection, hydraulic test and fitting with commissioning of vertical Boiler no WBL 10996 of Khandra Colliery NKJ Unit Under Bankola Area
2024_ECL_302712_1
ECL/GM/BA/E TENDER/23-24/EnM/346 Dt. 26.02.2024
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
BANKOLA AREA
Please refer to NIT document
5 documents required · 5 mandatory
₹2,100
8 Apr 2024
26 Feb 2024
8 Mar 2024
26 Feb 2024
7 Mar 2024
26 Feb 2024
26 Feb 2024 - 1 Mar 2024
Amount
Item Description/ Heading
Cleaning of all the ash from the bottom of the boiler
Cleaning of all the scale and rust from the boiler shale plate at fire side and washing the same
Cleaning of all the scale of the boiler shell plate by scraping, removing of all the foreign materials and washing the same at colliery store
Dsismantling of all the valves and fire bar and all side caps and depositing the same at colliery store
To build up the pitted portion of boiler shall crown by arc welding and grind smooth a smark out during inspection
To build up the uptake tube of the boiler by electric arc welding and dressing to be done by grinding to regime its original contour
Changing of defective burn out fuse piug, thread making ogf bore hole of shall crown plate etc
Overhauling lapping and necessary repairing of all the valves with supply and fitting of 2 set bush for gauge columm cock angel type S.V, Single post safety valve below dowen valve feed check valves gauge coumn cock
Hydraulic test of vertical boiler with banking and water fitting and conducting the inspection
Complete fitting of vertical boil with al fitting
Fabrication of fire bar with DA, Oxygen and electrode
Commissioning of boiler including firing of the boiler with in 48 hrs observation
Conducting of the dry inspection of the boiler by the dy. Director boiler, durgapur
To build up the pitted portion of boiler shall crown by arc welding and grind smooth a smark out during inspection
To build up the uptake tube of the boiler by electric arc welding and dressing to be done by grinding to regime its original contour
Changing of defective burn out fuse piug, thread making ogf bore hole of shall crown plate etc
Overhauling lapping and necessary repairing of all the valves with supply and fitting of 2 set bush for gauge columm cock angel type S.V, Single post safety valve below dowen valve feed check valves gauge coumn cock
Hydraulic test of vertical boiler with banking and water fitting and conducting the inspection
Complete fitting of vertical boil with al fitting
Fabrication of fire bar with DA, Oxygen and electrode
Supply of nut, bolts tape joint steam joint etc
Total impact of GST for the purpose of CTC
GT ENTERPRISE
SABIR CONSTRUCTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .