| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.6 CrAccepted-AOC A 24 HOUSING UNIT KOLLAMPALAYAM ERODE 638 002 | ERODE | TAMIL NADU | 638002 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹57.7 Cr+₹3.6 Cr (6.72%)Rejected-Finance | L2 | Rejected-Finance Highest Bid | |
| 3 | Rejected-Technical 1 171 RANA NAGAR BHAVANI ERODE TAMIL NADU 638301 | ERODE | TAMIL NADU | 638301 | - | Rejected-Technical Disqualified |
Tender Value
₹45.4 Cr
EMD Value
₹22.8 L
Closing Date
17 Apr 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
Office of the Superintending Engineer, Highways, NABARD and Rural Roads Circle, Opposite to Government workshop, Manakkadu Bus stop, Hasthampatty, Salem - 7
Forming Bypass to Tiruchengode town Km.6/2-12/8 (Phase-II)
2024_HWAY_422127_1
TN.No.31 /2023-2024 / SDO/ Dated.06.02.2024
Open Tender
Civil Works - Roads
Percentage
545 days
Salem
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹22.8 L
27 Jun 2024
9 Feb 2024
9 May 2024
9 Feb 2024
17 Apr 2024
9 Feb 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing heavy Jungle including uprooting trunk vegetation, grass, bushes, shrubs, sapplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness. as per Table - 201 MORT & H specification | 1,16,244 | Square Metre | 7.8 | ₹9,06,703.2 |
| 2 | Earth work excavation in cutting all classes of soils as per SS20B compacted thickness, watering, compaction by 80 - 100 KN power roller, rolling to achieve the required maximun dry density inculding labour charges for sactioning, watering with all leads for water inculding fuel and hire charges for power roller, water sprinker and other tools and plant employed etc, complete icluding Sl.No.61 page No:22 of current SOR 2023-24 | 16,916 | Cubic Metre | 112.05 | ₹18,95,437.8 |
| 3 | Forming Embankment using carted earth as per SS20B including cost of all labour charges, materials With a lead of 17km conveyance charges tools, equipments and all incidental charges, including compacting with powerroller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For embankment / sub grade - 95% compaction | 95,237 | Cubic Metre | 608.37 | ₹5,79,39,333.69 |
| 4 | Forming /Construction of subgrade using carted earth as per SS20B including cost of all labour charges, materials with a lead of 17km conveyance charges tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For embankment / sub grade - 97% compaction. | 57,056.04 | Cubic Metre | 683.69 | ₹3,90,08,643.99 |
| 5 | Earthwork excavation in Hard rock measured including Blasting & Stacking, complete requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification. | 13,701.47 | Cubic Metre | 792.3 | ₹1,08,55,674.68 |
| 6 | Refilling the excavated earth including conveyance of all materials to work site, including labour charges for filling in layers compacting by manual labour under optimum moisture content to get maximum density of layers including all incidental charges etc, complete for forming embankment (Labour Charges only ) SI.No.47 Sch Item no 85 page 23 of SOR 2023-2024 - Labour charges only. | 15,987.08 | Cubic Metre | 38.95 | ₹6,22,696.77 |
| 7 | Supply and fixing of R.C.C GUIDE POSTS of size 1.2x0.2x0.2m with tin M.S. sheet with two side packing in R.C.C 1:2:4 mix using 20mm HBG metal with 10mm dia bars as vertical with 8mm dia stirrups including 8.25 inches x 4.25 feet mould with star shape of 5 inches and top projection by 0.75 inches x 3 inches including cost and conveyance of materials to worksite etc.., complete. | 1,736 | No | 942 | ₹16,35,312 |
| 8 | Providing RCC M15 grade Boundry Piller (R.O.W) of standard design as per IRC 8 1980 and in position including painting and priniting etc complete (as per MORTH specification No 804)- Every 100 mts interval for Two side for fixing at Road foundary line. | 132 | No | 828 | ₹1,09,296 |
| 9 | Construction of Granular Sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification (Vth Revision) - for Grading- V | 9,747 | Cubic Metre | 1,518.43 | ₹1,48,00,137.21 |
| - | ix) Provision Junction Improvement for the work of Forming Bypass to Tiruchengode town Km.6/2-12/8 (Phase-II). | 2,203.03 | Cubic Metre | 1,518.43 | ₹33,45,146.84 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_501801.xls
BOQ • 0.54 MB
139228058.pdf
Tender Documents • 0.19 MB
139228060.html
Tender Documents • 0.03 MB
BID_Tiruchengode_Bypass_PhaseII.pdf
Tender Documents • 0.53 MB
PQ_Tiruchengode_Bypass_PhaseII.pdf
Tender Documents • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .