Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹8,600
Closing Date
31 Jul 2026, 3:00 pm5d left
Executive Engineer, PWD.,
Building Construction and Maintenance Division, Nagercoil
Construction of Toilet Building (Girls) in Government Higher Secondary School at Vallankumaravilai in Kanniyakumari District
2026_PWD_686289_1
e-Tender Notice No. 1(4) / C.8.1 / 229M / 2026-27 Dt.14.07.2026
Open Tender
Civil Works - Buildings
Lump-sum
Vallankumaravilai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,600
16 Jul 2026
16 Jul 2026
31 Jul 2026
16 Jul 2026
31 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 17.8 | M3 | 235.27 | ₹4,187.81 |
| 2 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 6.6 | M3 | 110 | ₹726 |
| 3 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for foundation and flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 10.5 | M3 | 5,264.54 | ₹55,277.67 |
| 4 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 7.5 | M3 | 156.23 | ₹1,171.73 |
| 5 | Supplying and filling in foundation, basement, etc with stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 5.3 | M3 | 282.71 | ₹1,498.36 |
| 6 | Random Rubble Masonry in cement mortar 1:5 (One cement & Five M-Sand) for foundation and basement using new stones including necessary provision for bond stone, including simultaneous pointing of the exposed surfaces with the same mortar and all incidental charges such as bailing out water, curing etc., complete with standard specification. | 12 | M3 | 5,770.22 | ₹69,242.64 |
| 7 | Rough Stone Dry Packing using new stones in dry condition for cesspool including all incidental charges such as baling out water, curing, finishing etc. complete complying with standard specification and as directed by the departmental officers. | 2.9 | M3 | 2,605.18 | ₹7,555.02 |
| 8 | Damp proof course as per IS 3067:1988 with Cement Mortar 1:4 (One Cement and Four crushed stone sand) 12mm thick mixed with best approved quality Integral liquid water proofing compound conforming to Indian Standard specification as specified by the departmental officers at 2% by weight of cement used , finishing and curing etc. complete complying with standard specification - Manual Mixing | 15.8 | M2 | 295.77 | ₹4,673.17 |
| 9 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener , side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 9.1 | M2 | 687.31 | ₹6,254.52 |
| 10 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 10 | M2 | 1,082.66 | ₹10,826.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
TD855Vallankumaravilai.pdf
Tender Documents • 1.60 MB
BOQ_824969.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].