Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Finance | -42.66% | ₹5.6 L | L1 | Admitted-Finance |
| 2 | L2₹6.8 LAdmitted-Finance | -30.00% | ₹6.8 L | L2 | Admitted-Finance |
| 3 | L3₹6.9 LAdmitted-Finance | -28.55% | ₹6.9 L | L3 | Admitted-Finance |
| 4 | L4₹9.6 LAdmitted-Finance | -1.00% | ₹9.6 L | L4 | Admitted-Finance |
| 5 | L5₹9.7 LAdmitted-Finance | +0.00% | ₹9.7 L | L5 | Admitted-Finance |
Tender Value
₹9.7 L
EMD Value
₹19,400
Closing Date
30 May 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Construction of Community Hall near Shiv Mandir Baspur chowk W.No 9 Pty Baspur under scheme (MPLADs) for the year 2025-26.
2026_RDPR_310164_1
e-NIT No. 34 REWJ of 2026-27 dated 18-05-2026
Open Tender
Civil Works
60 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹19,400
5 Jun 2026
18 May 2026
1 Jun 2026
18 May 2026
30 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour Engaged for site clearance | 10 | No. | 553 | ₹5,530 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as All kinds of soil : | 36.6 | Cum | 479.3 | ₹17,542.38 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 18.57 | Sqm | 5,202.9 | ₹96,617.85 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm indepth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 20 | Cum | 218.4 | ₹4,368 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 25.95 | Cum | 5,733.6 | ₹1,48,786.92 |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 13.14 | Cum | 9,395.7 | ₹1,23,459.5 |
| 7 | Steel work | 2,100 | kg | 123.2 | ₹2,58,720 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain windowsills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 21 | Cum | 9,821.85 | ₹2,06,258.85 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 80 | Sqm | 286.35 | ₹22,908 |
| 10 | Columns, pillars, piers, abutments, posts and struts. | 67.74 | Sqm | 742.55 | ₹50,300.34 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1003683.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid