| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | ₹2.7 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹2.7 LRejected-Finance | ₹2.7 L | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹2.7 LRejected-Finance LALPUR HURA | HURA | PURULIA | WEST BENGAL | 723130 | ₹2.7 L | L3 | Rejected-Finance 3rd Lowest |
| Sl No | Description | Qty | Unit | HIMADRI HAIT | R.K. ENTERPRISE | M.D.CONSTRUCTION . |
|---|---|---|---|---|---|---|
| 1.01 | Hire & Labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts as per direction including maintenance as required (upto 10’0” min height) roof should be projected upto 2’-0” from all walling.(Payment will be made as per floor area). For one day | 1 | Sqft. | 25.47 ₹30.05 | 25.61 ₹30.22 | 25 ₹29.50 |
| 1.02 | For additional 3 days | 1 | Sqft. | 6.11 ₹7.21 | 6.15 ₹7.26 | 6 ₹7.08 |
| 2.01 | Hire & Labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts including walling with water proof tarpaulin as per requirement and direction including maintenance as required (upto 10’0” min height) roof should be projected upto 2’-0” from all walling.(Payment will be made as per floor area). For one day | 1 | Sqft. | 28.53 ₹33.66 | 28.68 ₹33.84 | 28 ₹33.04 |
| 2.02 | For additional 3 days | 1 | Sqft. | 6.11 ₹7.21 | 6.15 ₹7.26 | 6 ₹7.08 |
| 3.01 | Hire & Labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullah post and bamboo framing as per direction. Roof should be projectedupto 2’-0” from all walling.(Payment will be made as per floor area). For one day | 1 | Sqft. | 27.51 ₹32.46 | 27.66 ₹32.64 | 27 ₹31.86 |
| 3.02 | For additional 3 days | 1 | Sqft. | 8.15 ₹9.62 | 8.2 ₹9.68 | 8 ₹9.44 |
| 4.01 | Fitting fixing in position of collapsible gate (on hire basis) as per direction (Payment will be made as per opening length) For one day | 1 | Ft. | 127.35 ₹150.27 | 128.05 ₹151.10 | 125 ₹147.50 |
| 4.02 | For additional 3 days | 1 | Ft. | 25.47 ₹30.05 | 25.61 ₹30.22 | 25 ₹29.50 |
| 5.01 | Hire and labour charges for bamboo barricading with sal post of 4” dia @ 4’ c/c including necessary frame works completeupto 3’ to 4’ ht. With 3 rows. For one day | 1 | Ft. | 76.41 ₹90.16 | 76.83 ₹90.66 | 75 ₹88.50 |
| 5.02 | For additional 3 days | 1 | Ft. | 8.15 ₹9.62 | 8.2 ₹9.68 | 8 ₹9.44 |
Tender Value
₹10 L
EMD Value
₹5,000
Closing Date
1 Apr 2026, 5:00 pmClosed
BLOCK DEVELOPMENT OFFICER
AMTA, HOWRAH
Erection of Pandals for DCRC, Counting Venue, Doors Windows of Strong room, installation of temporary privy, urinals, Generators, fan, light, plug point, microphone etc. and other accessories Renovative Supports to the strong room Training Venues
2026_ZPHD_1023385_1
WB/HOW/AMTA-I/NIEQ/3302/25-26
Open Tender
CIVIL AND ELECTRICAL WORKS
21 days
AMTA
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
₹5,000
15 Jun 2026
24 Mar 2026
3 Apr 2026
24 Mar 2026
1 Apr 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Hire & Labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts as per direction including maintenance as required (upto 10’0” min height) roof should be projected upto 2’-0” from all walling.(Payment will be made as per floor area). For one day | - | Sqft. | - | - | item1 | |
For additional 3 days | - | Sqft. | - | - | item2 | |
Hire & Labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts including walling with water proof tarpaulin as per requirement and direction including maintenance as required (upto 10’0” min height) roof should be projected upto 2’-0” from all walling.(Payment will be made as per floor area). For one day | - | Sqft. | - | - | item3 | |
For additional 3 days | - | Sqft. | - | - | item4 | |
Hire & Labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullah post and bamboo framing as per direction. Roof should be projectedupto 2’-0” from all walling.(Payment will be made as per floor area). For one day | - | Sqft. | - | - | item5 | |
For additional 3 days | - | Sqft. | - | - | item6 | |
Fitting fixing in position of collapsible gate (on hire basis) as per direction (Payment will be made as per opening length) For one day | - | Ft. | - | - | item7 | |
For additional 3 days | - | Ft. | - | - | item8 | |
Hire and labour charges for bamboo barricading with sal post of 4” dia @ 4’ c/c including necessary frame works completeupto 3’ to 4’ ht. With 3 rows. For one day | - | Ft. | - | - | item9 | |
For additional 3 days | - | Ft. | - | - | item10 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_2515290.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid