| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 CrAccepted-AOC NANDEAON NIGAHI DISTT SINGRAULI MP 486884 | NIGAHI | SINGRAULI | MP | 486884 | ₹6.3 Cr | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹7.5 CrRejected-Finance AT PO BARALOTA BY PASS ROAD DALTONGANJ DISTT PALAMU JHARKHAND 822121 | GARHWA | JHARKHAND | 822121 | ₹7.5 Cr | L2 | Rejected-Finance NOT LOWEST BIDDER |
| 3 | L3₹7.9 CrRejected-Finance | ₹7.9 Cr | L3 | Rejected-Finance NOT LOWEST BIDDER |
| 4 | L4₹9.4 CrRejected-Finance | ₹9.4 Cr | L4 | Rejected-Finance NOT LOWEST BIDDER |
| 5 | Rejected-Technical | - | - | Rejected-Technical DOES NOT FULFILL ELIGIBILITY CRITERIA |
Tender Value
₹9.7 Cr
EMD Value
₹12.1 L
Closing Date
9 Mar 2026, 6:55 pmClosed
GM CIVIL HOD NCL
OFFICE OF GENERAL MANAGER CIVIL/HOD NCL HQ
Development of additional internal road for coal transportation in West Section at Jayant Project.
2026_NCL_353331_1
GM(C)/SGR/25-26/ETN-10 Dated 16.02.2026
Open Tender
Civil Works - Roads
180 days
Jayant Project
AS PER NIT
5 documents required · 5 mandatory
₹12.1 L
2 Jun 2026
16 Feb 2026
10 Mar 2026
16 Feb 2026
9 Mar 2026
17 Feb 2026
16 Feb 2026 - 2 Mar 2026
Earth work in excavation in all kind of soil/ silt by mechanical means (hydraulic excavaror)/ manual means including dozering, trasnportation, unloading at designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all lifts (for all project of NCL
Excavation in Soil usingHydraulic Excavator and Tippers with disposal upto 1000 metres:Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification
Construction of dry lean cement concrete Sub-base over a prepared sub grade with coarse and fine aggregate conforming toIS: 383, the size of coarse aggregate not exceeding 25mm, aggregate cement rationot to exceed 15:1 , aggregate gradation after blending tobeasper table600-1, cement content not tobe less than150kg/cum ,optimum moisture content to be determined during trial length construction, concretestrength not to be less than 10M pa at 7days, mix design batching plant, transportedto site, laid with apaver with electronic sensor,compactingwith8-10tonnes vibratory roller, finishingandcuringas per clause 601 of specification complete in all respect.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-40 grade concrete over a prepared sub base with cement ,coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound,finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc.
Deduct from Item No.6.3 & 6.4 above if paver with electronic sensor is not used and laying, compaction is done by any other method (The acceptance criteria regarding level, thickness, surface regularity, texture finish, strength of concrete and all other quality control measures shall be the same as in case of machine laid
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All workup to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3graded stone aggregate 20 mm nominal size de rived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Suspended floors, roofs, landings, balconies and access platform
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand)
Add extra in Item No.6.3, 6.4, 6.6 & 6.10 above for the cost of steel in dowel bar and Tie bar Mildsteel 25mm
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.66 MB
BOQ_366121.xls
BOQ • 0.30 MB
NITETN10.pdf
Tender Documents • 2.64 MB
Download all tender documents and submit your bid