| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-Finance | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹3.6 L+₹25,475.10 (7.69%)Accepted-Finance | L2 | Accepted-Finance BOQ Rate accepted |
Tender Value
₹3.3 L
EMD Value
₹3,400
Closing Date
24 Jun 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Civil TTPS
Office of the SE Civil TTPS Tuticorin 628 004
Repair and maintenance works to the Cooling Water House 1 repair bay area
2020_EB_164546_1
SE C TTPS 78 2020 2021
Open Tender
Civil Works
Works
90 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,400
26 Jun 2020
22 May 2020
25 Jun 2020
22 May 2020
24 Jun 2020
22 May 2020
90 days
Amount
Providing two legged scaffolding for works up to 3m. heights, using 13 to 15 cm. dia. casuarina props, the distance between the two rows being 1.25m. and the spacing of posts being 2m. in both the rows with two horizontal posts with 0.5m. overlap on either side and braces at 2m. c/c including longitudinal & transverse middle braces to step up and providing a platform with country wood planks of 40 mm. thick & 1m. width, etc. including cost of all materials, labours, lead, lift, safety measures, etc. complete. For an average height of 7 mtr.
Dismantling the spalled / distressed RCC and loose particles from the existing concrete including roughening the surface after thorough cleaning, rate including cost of all labour, lead, lift etc., complete.
Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete.
Providing RCC 1:1.5:3 using OP/PP cement with 12 to 20mm metal including cost of all materials, labours, lead, lift, tools, curing etc. complete.
Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift, tools etc., complete.
Plastering with C.M 1:3, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing one coat of white wash with white cement to the newly plastered area including cost of all materials, labour, lead, lift etc., complete.
Providing two coats of Acrylic distemper of approved quality, brand & colour for old ceiling & inner wall surfaces including cost of all materials, scaffolding charges, labours, lead, lift, curing, etc. complete.
Supplying and providing 6mm wired glass for windows after replacement of damaged glasses including fixing all other acessories such as 8mm U channel screws glass putty including cost of labour charges lead lift etc., complete.
Removing the existing damaged felt and cleaning the surfacce free from oil, dust, dirt, grease etc., and transporting the debries with 1km lead away from the site and lowering from the surface with water till the saturation for the entire area, rate including labour, lead lift etc., complete.
Plastering with C.M 1:3, 12 mm thick with Nitobond AR mixed in cement mortar at 250ml/bag of cement rate including cost of all materials, labours, lead, lift, curing, etc. complete
Supplying and providing water proof treatment over the existing roof slab with polymeric asphalt membrane sheet (4kg/m2) constituting 7 layers with thermo fusible HM HDFE film one at top and other of bottom layer of this polymeric mix 1 layer of fibre glass tissue, 2 layers of polymeric mix on the top and bottom of 90 microns HM HDPE film, cracks on roof slab to be filled with cement based filter, laying of PAM sheets over a coating of 90/15 hot blown bitumen with 100mm over lap sealed by LPG flame torch further coated with oxides bitumen 90/15 and finally coated with aluminium coating and also extra attention should be given in roof / drain curve portion as per instruction of site Engineer including cost of all labour, lead, lift, T& P etc complete.
C.S.R ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .