| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC S A | ₹2.3 L | L1 | Accepted-AOC Quoted less than Tender Value |
| 2 | L2₹2.3 LRejected-AOC | ₹2.3 L | L2 | Rejected-AOC Quoted more than Tender Value |
| Sl No | Description | Qty | Unit | S A Srinivasan L1 | M.Ravi shankar L2 |
|---|---|---|---|---|---|
| 1.00Vellore District Construction of Culvert and Retaining wall at kandaneri BG Road in Kandaneri Panchayat in Anaicut Block SFC (BP) 2025 -2026 Package no 03 | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B | 32.45 | cum | 263.67 ₹8,556.09 | 268.42 ₹8,710.23 |
| 3.00 | Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 3.25 | cum | 5,487.01 ₹17,832.78 | 5,585.82 ₹18,153.92 |
| 4.00 | Supplying & Erecting Centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying for etc Complete | 44.95 | sqm | 547.28 ₹24,600.24 | 557.14 ₹25,043.44 |
| 5.00 | Cement concrete in 1:3:6 mix using 20mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 21.06 | cum | 5,791.41 ₹1.2 L | 5,895.7 ₹1.2 L |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.11 | cum | 91,858.54 ₹10,104.44 | 93,512.66 ₹10,286.39 |
| 7.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.9 | cum | 9,379 ₹8,441.10 | 9,547.89 ₹8,593.10 |
| 8.00 | Provision of Name board Charges | 1 | nos | 999.6 ₹999.60 | 1,017.6 ₹1,017.60 |
| 9.00 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | Each | 34,650.24 ₹34,650.24 | 35,274.26 ₹35,274.26 |
Tender Value
Refer Docs
EMD Value
₹4,600
Closing Date
21 Jan 2026, 3:00 pmClosed
The Block Development Office Anaicut
The Block Development Office Anaicut
Vellore District Construction of Culvert and Retaining wall at kandaneri BG Road in Kandaneri Panchayat in Anaicut Block SFC (BP) 2025 -2026 Package no 03
2026_RDTN_640327_1
A2/2500/2024 ACT JAN 03-26
Open Tender
Civil Works
180 days
The Block Development Office Anaicut
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4,600
16 Mar 2026
7 Jan 2026
21 Jan 2026
7 Jan 2026
21 Jan 2026
7 Jan 2026
Vellore District Construction of Culvert and Retaining wall at kandaneri BG Road in Kandaneri Panchayat in Anaicut Block SFC (BP) 2025 -2026 Package no 03
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete.,
Supplying & Erecting Centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying for etc Complete
Cement concrete in 1:3:6 mix using 20mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete.,
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Provision of Name board Charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_766737.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tendernotice_2.pdf
PDF • 0.37 MB
BOQ_766737.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid