Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.0 LAccepted-Finance | L1 | Accepted-Finance FOUND OK | |
| 2 | L2₹26.3 L+₹37,808 (1.46%)Accepted-Finance | L2 | Accepted-Finance FOUND OK | |
| 3 | L3₹26.4 L+₹43,499 (1.68%)Accepted-Finance F 16 GANESH SHANKAR VIDYARTHI NAGAR PANKI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | L3 | Accepted-Finance FOUND OK |
Tender Value
₹26 L
EMD Value
₹26,000
Closing Date
10 Oct 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC BARABANKI
33/11 KV SUBSTATION BAREL BARABANKI
Work Under System Augmentation Plan under EE,EDD, Ramnagar
2023_MVVNL_845700_1
95/EDC BARABANKI/2023-24
Open Tender
Electrical Works
Fixed-rate
30 days
EDD II BARABANKI RAMNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EDC BARABANKI
₹26,000
Yes
20 Oct 2023
3 Oct 2023
11 Oct 2023
3 Oct 2023
10 Oct 2023
3 Oct 2023
Amount
Safe loading Carriage including unloading and proper stacking of following materials from central store Barabanki / JE Store to site of work.
PCC Pole 8.5
11kv Pin Insulator .
11kv Disc Insulator .
Top Channel 11 kv
DROPPER CHANNEL
T-off Channel 11 kv
Sub-Station Base Angle
11kv X-ARM
F Bracket
MS Earthing Rod
Transformer 16 KVA
Transformer 25 KVA
Transformer 63 KVA
Transformer 100KVA
Transformer 250 KVA
Transformer 400KVA
LT XLPE CABLE 3.5X150 SQMM
LT XLPE CABLE 3.5X240 SQMM
ABC Cable 1x25+1x16 SQ. MM.
LT XLPE CABLE 3.5X70 SQMM
LT XLPE CABLE 3.5X400 SQMM
11 KV XLPE CABLE 3X300 SQMM
11 KV CABLE JOINTING KIT 3x300 O/D
11 KV CABLE JOINTING KIT 3x300 I/D
11 KV CABLE JOINTING KIT 3x120 O/D
11 KV XLPE Cable Jointing Kit Straight Through All Size.
ACSR Weasal Conductor
11 kv VCB panel Outgoing CTR 200/100/5 A, 350 MVA
11 kv VCB panel incoming CTR 600/300 5A, 350MVA
Stay Set Complete
Other Line Material
Dragging of pole from JE Dump Store to site
Erection of Stay set of 16x1800 mm rod duly painted with red oxide,anchor plate, thumble turn buckle and stay insulate etc. digging of pit of size of size 0.4x0.6x1.6 m for grouting 1:3:6 cement concrete, with stay of size 7/8 SWG, nuzzling & Grouting.
Stringing and sagging of 11 KV line with ACSR Weasal Conductor including nuzzling binding and jumpering (weasal conductor will be provided by the department)
Erection of Substation type double pole with PCC Pole 8.5 Mtr. Long including mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt 33/11 KV line including grouting of support and plinthing 300 mm above ground level, fitting of 33/11 KV pin & Pin insulator. 1/6 of total lenght of poles will remain under the ground and planted on stone pad of Size 300x300x75 MM.
Grouting of PCC/ST Pole
Earthing of pole with MS Earthing.
Stringing and Sagging of LT 1X16 ABC Cable (LT ABC Cable will be provided by the department)
Laying of11 KV XLPE Cable 3x50/70/120/185/300Sq mm by Dril Method / Mannually
laying of LT XLPE Cable 3.5x/150/240/400/ 70Sq mm by Dril Method / Mannually
Installation of Mounting of Following capacity of Transformer including its connection between 11 KV and LT Line mounting of copper L-Pieces, providing Crimping type Aluminium lugs of required size.( All the material except transformer will be arranged by the contractor)
Mounting of 25 KVA Tranformer
Mounting of 63 KVA Tranformer
Mounting of 100 KVA Tranformer
Mounting of 250 KVA Tranformer
Mounting of 400 KVA Tranformer
Mounting of 16 KVA Tranformer
Cartrige LT XLPE CABLE AL.3.5x70/150/240/400sq.mm
cartridge of CABLE AL. 3x300 sqmm XLPE 11 Kv
carrriage of 11 KV CABLE JOINTING KIT 3x300 O/D, ID
Providing & Fixing of various type all material shall be provided by the Contractor.
Nut & Bolt
LT Clamp with insulator
Sackle insulator
I-J Hook Clamp with J-Hook
Clamp for Top/ Dropper and T-off Channel etc.
Loop Insulator
33 kv control panel for single T/F
33 KV VACUUM CIRCUIT BREAKER 1250 AMP.
Installation of 11 kv VCB panel Outgoing CTR 200/100/5 A, 350 MVA
Installation of 11 kv VCB panel incoming CTR 600/300 5A, 350MVA
Wiremess fencing of 11/0.4 KV S/S shall be made of rectangular of size as per site requirement not exceeding 3 meter fabrication 45x45x5 mm angle the frame is also have 1 no. Horizontal runner of MS flat 40x5 welded in middle to support of wire mess. Rectangular welded type wire mess of size 50x25 made of 12 S.W.G. wire mess shall be welded all along the periphery of the frame as well as on horizontal runner to give extra strength of welding to wire mess welded on the frame. Diagonal bracing of all the frame panel will be welded with MS flat of size 25x3mm to support as per RESPO specification & direction of E/I
Construction of T/F Plinth of size 2x2x1.5 mtr with first class brick and Massionary work in the ratio 1:4 cement and core sand with RCC top 20 mm 1:2:2 cement sand & core sand stone grit with 20 Mm MS bar and MS Channel for resting of T/F.
Dismentaling of 10/16/25/63/100/250/400 KVA T/F & Carriage site to store
Supply of trolley size of 3658mm length X 1929mm length width X2300 mm height with main chechis of size 100 mm X 50 mm MS channel of 6 mm thick, support channel of size 75mm X 40 mm MS channel of 6 mm thick and floor with 6 mm thick chequred plate. Side walls made up with welded wire mesh and rear door fixed by hings & lock. Axle 02 Nos of 63mm square, rim double plated 04 nos, Tyres 04 number size 7 -50:16 16Toe hookshall be made up forget Steel, suspension system axlel will be fitted with leaf spring and rough covered with GI sheet. Fuse mounting is of 63X63X 40cm box pipe including connection between transformer and switch fuse box, 500 amperes men switch 4 pole with HRC fuse protection, 50X50X5 mm MS Angle and 75X38mm "C" channel clamp 2 nos for transformer. Carrying capacity of 5 Ton for mounting of 400 kVA transformer (Driving up trolley attached) rate should be quoted by the contractor inclusive of the following.
Other Line Labour Work
OM SUNIL CONTRATOR AND SUPPLIERS
POOJA ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .