Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹44.1 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹44.6 Cr+₹51.6 L (1.17%)Admitted-Finance 3RD FLOOR ROOM NO 3004 A LAXMIPRIYA 752101 KHORDHA ODISHA INDIA | KHORDHA | ODISHA | 752101 | L2 | Admitted-Finance | ||
| 3 | Rejected-Technical | - | Rejected-Technical Non-Responsive. | ||
| 4 | Rejected-Technical PLOT NO 2222 AT PO SALIPUR CUTTACK ODISHA CUTTACK ODISHA 754202 | CUTTACK | ODISHA | 754202 | - | Rejected-Technical Non-Responsive. |
Tender Value
₹40.6 Cr
Closing Date
29 Aug 2022, 5:30 pmClosed
MANAGING DIRECTOR OF OCC LTD.
OCC LTD, UNIT - 8, GOPABANDHU NAGAR, BBSR-751012
Construction of Under Ground Pipe Line Irrigation System (Gravity Flow) in Borangijore MIP, Junanijore MIP and Katagaon MIP in Bolangir district, Baghia MIP in Mayurbhanj district and Kandaposi MIP in Keonjhar district...
2022_OCCL_80398_1
E-procurement Notice No. 12/OCCL/2022-23 (on-line)
Open Tender
Civil Works - Others
Percentage
365 days
BOLANGIR, MAYURBHANJ AND KEONJHAR.
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
Exempted
CONFERENCE HALL OF OCC LTD.
19 Sept 2022
8 Aug 2022
30 Aug 2022
8 Aug 2022
29 Aug 2022
8 Aug 2022
8 Aug 2022 - 16 Aug 2022
17 Aug 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Execution of under ground pipe line (UGPL) system for a total CCA of 217.195 Ha in Borangijore Minor Irrigartion Projects on percentage rate basis including pre construction survey, execution as per planning & design, testing of pipe materials, providing & laying with DI pipes (DI > or = 250mm dia) Ductile Iron class- K7 and K9 as per relevant IS code as per approved Drawing , with suitable jointing materials for stiffness class 2500 N/M2 as per IS-12709 & IS-14402 and High Density Polyethylene (HDPE) pipes of class PE-100, PN 6,PN8,PN10 and PN12.5 as per Aproved Drawing , as per relevant IS code (HDPE pipe internal dia < 250mm) having test pressure of approved standard for Pipe network as specified in technical specification, including D.I Air valves, , Butterfly valves, Sluice Valves, Reducers,Tee, Cross and Bend of matching materials, nuts & bolts of required sizes & specification and of approved make and quality and other construction materials including cost of all materials labour charges, all taxes, labour cess, Excluding GST, loading & unloading charges, transportation charges, cost of lowering, laying and jointing to proper allignment and position including earth work in excavation of trenches in all kinds of soils, D.I, Rock strata and with sand cushion of approved thickness for pipes and proper compaction of back filled earth and borrow earth in layers and including cost of Cement Concreting / R.C .C of approved grades, NP3 Hume Pipes of required diameter, Flush Structures and Turnout structures at required locations as per Approved Drawing etc. complete with all other ancillary works to complete the pipe network for providing irrigation at each ha. of CCA as per specification and direction of the Engineer-in-charge. | |||||
| 1.01 | Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation up to 2.50m.including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge. | 23,656.2 | Rmtr | 83.74 | ₹19,80,970.19 |
| 1.02 | Filling the excavated trench with 150 mm thick sand free from silt and organic materials suitably spread to uniform thickness in rock & D.I. zone of the excavated trench for laying D.I./ H.D.P.E. Pipes over it with cost of all materials including royalties, labour cess, including cost of transportation, with all leads and lifts/delifts,including loading, un-loading , handling, rehandling and T&P etc.(excluding GST) complete as per specification and the directions of the Engineer- in - charge. | 23,656.2 | Rmtr | 18.43 | ₹4,35,983.77 |
| 1.03 | Backfilling the excavated trenches, after laying of D.I./H.D.P.E. Pipes, with suitable excavated materials(Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required ,including disposal of the surplus excavated earth away from work site with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge. | - | - | - | - |
| 1.031 | a) In zones where depth of cutting is less than equal to 2.5m | 23,656.2 | Rmtr | 45.49 | ₹10,76,120.54 |
| 1.04 | Procurement and supply of centrifugally cast (spun) Ductile Iron pressure pipes with Spigot and Socket ended class K7 Pipes suitable for (push on type) Rubber Gasket jointing conforming to IS:8329-2000 (latest Revision) with inside Factory- centrifugally-applied cement mortar lining ( Slag Cement) and external Zinc coating followed by a finishing layer of Bitumen coating duely ISI marked including cost of EPDM Gasket complete including cost of pipe, cost of testing, inspection charges etc. transportation to work site, stacking at site, loading, un-loading, handling, rehandling, labour cess, including all taxes , duties, insurance, etc. (excluding GST) complete as per the specification and directions of the Engineer-in -charge; for the following nominal diameters | - | - | - | - |
| 1.041 | DI K7 700 mm DIA | 991.1 | Rmtr | 13,033.9 | ₹1,29,17,898.29 |
| 1.042 | DI K7 600 mm DIA | 1,483 | Rmtr | 9,285.38 | ₹1,37,70,218.54 |
| 1.043 | DI K7 500 mm DIA | 891.7 | Rmtr | 7,131.61 | ₹63,59,256.64 |
| 1.044 | DI K7 450 mm DIA | 325.6 | Rmtr | 6,126.56 | ₹19,94,807.94 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_407438.xls
BOQ • 0.81 MB
DTCN.pdf
Tender Documents • 4.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .