Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹99,020Accepted-AOC CHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | ₹99,020 Quoted ₹99,162.32 | L-1 | Accepted-AOC Bidder quoted a lowest rate in submitted bids. |
| 2 | L-2₹1.0 LRejected-Finance P O DHUSSARA TEHSIL AMB DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹1.0 L | L-2 | Rejected-Finance Bidder quoted a higher rate then L-1. |
| 3 | L-3₹1.0 LRejected-Finance SANTOKHGARH DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | ₹1.0 L | L-3 | Rejected-Finance Bidder quoted a higher rate then L-1. |
Tender Value
₹94,530
Closing Date
5 Jan 2026, 10:00 amClosed
Sr. Executive Engineer
Sr. Executive Engineer ED HPSEBL Amb
Tender or Strengthening, System Improvement, Recovery and Reconstruction of damaged Board property due to natural calamity during 2023-24 in (E) section Dharmshala Mahanta under ESD, HPSEBL, Bharwain. Bid NO- AED/161/2025-26.
2025_HPSEB_124695_1
AED/161/2025-26
Open Tender
Electrical Works
90 days
Sr. Executive Engineer ED HPSEBL Amb
Please refer a tender document.
2 documents required · 2 mandatory
₹590
25 Apr 2026
30 Dec 2025
5 Jan 2026
30 Dec 2025
5 Jan 2026
30 Dec 2025
Supply Part of LT Line
Prov. L.T. Stay Set in all respect.
Shackle Insulator (16 kN)
D-Iron (U- Clamps) with nut and bolts
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Full Clamps ( 1 No for Stay Set)
Half Clamp for X-arm
Earthing Set complete
Nuts and Bolts of Various Sizes (Galvanised / Coated)
Material for HT Line
Prov.11kv Disc Insulators complete for double pole str in all respect
Prov.X-Arm (Horizontal) MS-Channel Iron (100x50x5mm) Length 2340 mm x2 Nos. (∆) Formation
Prov.11kv Pin Insulator with pin complete in all respect
Prov.11kv Stay Set in all respect.
Prov. Half Clamp
Prov. Full Clamp
Prov.11kv Earthing set complete in all respect.
Prov. Cross Arm: [Channel Iron (100x50x5 mm), Length: 1270 mm
11 kV Post Insulator
Nuts and Bolts of Various Sizes (Galvanised / Coated)
Stay Wire (7/3.15 mm) (9 kg Per Stay Set)
ERECTION PART
Erection of PCC Pole 8/9 Mtr. Long:- Digging of Pit fixing of insulator and drilling of holes in X-Arm , Bracing Set, Top Clamp, errection of pole, fixing of barbed wire and danger plate, filling of Pit and ramming, painting of poles complete in all respect.
Re -Sagging of Conductor 7/3.81 mm line length = 0.013*4= 0.0520 Km of LT line.
Re - Erection Charges of LT stay Set
Re - Erection Charges of HT stay Set
Erection of GI Wire
Erection Charges of LT Earthing Set.
Erection Charges of HT Earthing Set.
Add Transportation Charges 5% of Material cost.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_183315.xls
BOQ • 0.31 MB
Bid161.rar
Tender Documents • 9.83 MB
Download all tender documents and submit your bid