| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹401.4 CrAccepted-AOC CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹401.4 Cr Quoted ₹428.7 Cr | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹550.0 CrRejected-AOC NCC HOUSE MADHAPUR HYDERABAD 500081 TELANGANA INDIA TELEPHONE 040 23268730 | ₹550.0 Cr | L2 | Rejected-AOC L2 |
Tender Value
₹334.3 Cr
EMD Value
₹6.7 Cr
Closing Date
25 Jan 2024, 2:00 pmClosed
CE, PWD(Bldg), Assam, Chandmari, Ghy-3
O/O The CE, PWD(Bldg), Assam, Chandmari, Ghy-3
Maa Kamakhya Temple Access Corridor at Guwahati, Assamon Engineering, Procurement and Construction (EPC) Mode-1
2023_PWBNH_34262_1
CE/TB-VI/26/2023/12 Date 28.11.2023
Open Tender
Civil Works - Building
730 days
KAMAKHYA
Please refer Tender documents.
5 documents required · 5 mandatory
₹30,000
₹6.7 Cr
Yes
18 Mar 2024
29 Nov 2023
25 Jan 2024
29 Nov 2023
25 Jan 2024
9 Dec 2023
Amount
Salvage: Credit for Demolition of building structures etc. complete and taking away all fetched material out of campus within 30 days after completing demolition part except the C&D waste kept for recycling and used the recycle product for non structural work such as in foot path, manhole, lean concrete, filling under plinth, re-filling of foundation etc. or as approved by Engineer-in-charge complete in all respect. The serviceable material received from dismantling/demolishing to be kept with executing agency and take away from the site as per direction of engineer-in-charge. Note : This amount to be paid by agency to the department. Quote the lump sum amount (in minus)
Construction OfMaaKamakhya Temple Access Corridor Including All Development Works (Civil, Electrical, Plumbing, Fire Fighting, Hvac&Elv) at Guwahati Assam”. (The Master Plan, Architectural Drawings, Detailed design drawings, Engineering Drawings & Working Drawings will be provided by the Public Work Department (Building), Assam based on requirements, concept drawings, DBR, Technical Specifications as uploaded with tender document and same shall be followed by contractor during execution).
As per Site Condition: Sewerage Drainage Water Supply Provision for Re-Routing And Upgradation Of Backbone Infrastrcuture And High Side Electrical Rerouting And Upgradation Of Backbone Infrastrcuture.
HVAC WORK: Operation & maintenance (routine & preventive ) and breakdown maintenance of high side & low side of the Air conditioning plant comprising of all the machinery, equipment installed in the A.C. Plant room. Operation& Maintenance For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Three Year Of DLP)
STP,WTP,ETP,FIRE PUMP: Operation & comprehensive maintenance STP,WTP, ETP , FIRE PUMP units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Operation& Maintenance For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Three Year Of DLP)
Lifts:Operation& comprehensive maintenance LIFT units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumables, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Operation& Maintenance For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Three Year Of DLP)
ESS, DG SETS, TRANSFORMER: Operation & comprehensive maintenance ESS, DG SETS units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Operation& Maintenance For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Three Year Of DLP)
Housekeepingof premises to be done by contractor till handing over & All Operation To Client as per General practices, cost of which is included in Quoted price. For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Three Year Of DLP)
Security of Premises to be done by contractor till handing over & All Operation To Client as per General practices, cost of which is included in Quoted price. For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Three Year Of DLP)
NCC Limited
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid