Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 CrAccepted-AOC 2974 URBAN ESTATE JIND 126102 | JIND | JIND | HARYANA | 126102 | ₹3.4 Cr | 1 | Accepted-AOC Work Allotted |
| 2 | 2₹3.6 CrRejected-AOC 464 21 NEW ANAJ MANDI TOHANA 125120 | FATEHABAD | HARYANA | 125120 | ₹3.6 Cr | 2 | Rejected-AOC Unallotted |
| Sl No | Description | Qty | Unit | Sunil Kumar L2 | PARAMJEET CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Supply of LED Light 100 watt | 2 | Each | 3,000 ₹6,000 | 2,000 ₹4,000 |
| 2.00 | Supply ,erection testing and commissioning of Horizontal motor pumping set of raw water having head 35.00 m as requirements of discharge 1500 LPM and power capacity 20.00 BHP as ISI Marked INCLUDING GST | 2 | Each | 2,00,000 ₹4 L | 2,50,000 ₹5 L |
| 3.00 | Operation and Maintenance of Raw water arrangement for complete scope of work mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT.
1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only) | 1 | Job | 1,20,000 ₹1.2 L | 2,00,000 ₹2 L |
| 4.00 | 1st year Operation and maintenance after defect liability period | 1 | Job | 1,20,000 ₹1.2 L | 2,00,000 ₹2 L |
| 5.00 | 2nd year Operation and maintenance | 1 | Job | 1,20,000 ₹1.2 L | 2,00,000 ₹2 L |
| 6.00 | 3rd year Operation and maintenance | 1 | Job | 1,20,000 ₹1.2 L | 2,00,000 ₹2 L |
| 7.00 | 4th year Operation and maintenance | 1 | Job | 1,20,000 ₹1.2 L | 2,00,000 ₹2 L |
| 8.00 | 5th year Operation and maintenance | 1 | Job | 1,20,000 ₹1.2 L | 2,00,000 ₹2 L |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
27 Apr 2026, 3:00 pmClosed
BHANU PARKASH SHARMA
Jind PHED No. 2
Akal Garh Raw Water arrangement by pumping from Bhiwani Sub Branch and Renovation of existing Water works and Laying of Balance Distribution Pipe Line in Village Akalgarh Distt. Jind CM Annoucement Code 28715
2026_HRY_515552_1
20262B1C3699 62D6 4B3D BF66 8C7399BEFFFF569PUH
Open Tender
Civil Works
365 days
AKALGARH
4 documents required · 4 mandatory
₹15,000
₹7.4 L
Yes
8 Jun 2026
16 Apr 2026
27 Apr 2026
16 Apr 2026
27 Apr 2026
16 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Supply of LED Light 100 watt | - | Each | - | - | |
Supply ,erection testing and commissioning of Horizontal motor pumping set of raw water having head 35.00 m as requirements of discharge 1500 LPM and power capacity 20.00 BHP as ISI Marked INCLUDING GST | - | Each | - | - | |
Operation and Maintenance of Raw water arrangement for complete scope of work mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT.
1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only) | - | Job | - | - | |
1st year Operation and maintenance after defect liability period | - | Job | - | - | |
2nd year Operation and maintenance | - | Job | - | - | |
3rd year Operation and maintenance | - | Job | - | - | |
4th year Operation and maintenance | - | Job | - | - | |
5th year Operation and maintenance | - | Job | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_594396.xls
BOQ • 0.30 MB
1F4BOQZ155891.pdf
Additional Documents • 1.73 MB
Download all tender documents and submit your bid