Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
27 Aug 2026, 10:00 am3d left
Executive Engineer kasumpti Division HPPWD Shimla3
Executive Engineer kasumpti Division HPPWD Shimla3
Regarding revised estimate of Construction work of additional two room classrooms in R/O Govt. Senior Secondary School Mehli
2026_PWD_141490_1
SD-I-CTR-Tender-26- 14949 dt 18-8-26
Open Tender
Civil Works
Percentage
30 days
Shimla
As per SBD
12 documents required · 12 mandatory
₹500
₹30,000
19 Aug 2026
19 Aug 2026
27 Aug 2026
19 Aug 2026
27 Aug 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing form work with steel plates 3.15mm(three point fifteen milimetre) thick welded with angle iron in frame 30x30x5mm (thirty into thirty into five milimetre) so as to give a fair finish i/c centring, shuttering, strutting and propping etc. with wooden/steel battens and bailies in all heights or propping and centring, below supporting floor to ceiling and removal of the same for in situ- reinforced concrete and plain concrete work including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) Flat surfaces such as soffits of suspended floors, roofs, landings etc upto 200mm thickness. | 1 | Per Square Meter | 350 | ₹349.65 |
| 1.1 | Column Pillars | 1 | Per Square Meter | 350 | ₹349.65 |
| 1.2 | Beams | - | Per Square Meter | 350 | - |
| 1.3 | Edges of slab and break in floor and wall 20 cm wide. | 1 | Per Running Meter | 150 | ₹149.85 |
| 2 | Providing and laying cement concrete 1:1.5:3 (1 cement : 1.5 : sand : 3 graded stone aggregate 20 m nominal size and curing complete excluding cost of form work, lead as per direction of Engineer - in - charge. (i) Suspended floor, lintels ,beams , column girders bressumers and cantilevers upto floor two level . | 1 | Per Cubic Metre | 7,600 | ₹7,592.4 |
| 3 | Poviding mild steel / Torsteel reinforcement for R.C.C work including, bending , binding and placing in position complete upto floor two level: Tor steel, including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | - | Per kilograms | 115 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
SBD1462813.pdf
Tender Documents • 6.92 MB
BOQ_210031.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].